Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 126 - 150 of 847
View: 25 | 50 | 100
Document IDsort ascending Title Type Published
MPMC00050 TSF Design Report Summary (397.9 KB) Table Nov 04, 2014
MPMC00049 TSF Design Report Summary (30.73 KB) Table Nov 03, 2014
MPMC00048 Document has been removed Uncategorized Oct 22, 2014
MPMC00047 Magnetite Plant Expert Panel Information Request, Response and Attachments (3.83 MB) Uncategorized Oct 03, 2014
MPMC00046 Magnetite Plant Information Data Transfer Summary (180.12 KB) Uncategorized Oct 03, 2014
MPMC00045 Document has been removed Report Jul 25, 2014
MPMC00044 Mount Polley Mine Tailings Storage Facility Stage 9, 2013 As-Built and Annual Review Report (40.75 MB) Report Mar 12, 2014
MPMC00043 Mount Polley Mine Tailings Storage Facility Stage 9, 2013 Construction Monitoring Manual (11.39 MB) Report Apr 11, 2013
MPMC00042 Mount Polley Mining Coporation, Mount Polley Mine, Tailings Storage Facility 2012 Annual Review (6.02 MB) Report Apr 08, 2013
MPMC00041 Mount Polley Mine Tailings Storage Facility Stage 8/8A 2012 As-Built Report (27.14 MB) Report Mar 27, 2013
MPMC00040 2012 Stage 8A Tailings Storage Facility Construction Drawings and Stability Analyses for Embankment Raise El. 965m (7.15 MB) Report Sep 10, 2012
MPMC00039 Mount Polley Mines, Tailing Storage Facility, 2011 Construction As-Built and Annual Review (7.29 MB) Report Mar 30, 2012
MPMC00038 Mount Polley Mines, Tailing Storage Facility Stage 8, 2012 Construction Monitoring Manual (3.2 MB) Report Mar 30, 2012
MPMC00037 Mount Polley Mines, Tailing Storage Facility Stage 7, 2011 Construction Monitoring Manual (10.55 MB) Report Apr 20, 2011
MPMC00036 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on 2010 Annual Inspection (Ref. No. VA101-1/29-2) (6 MB) Report Jan 25, 2011
MPMC00035 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 6B Construction (Ref.No. Va101-1/29-1) (9.79 MB) Report Jan 25, 2011
MPMC00034 Mount Polley Mining Corporation Mount Polley Mine, Tailings Storage Facility Report on 2009 Annual Inspection (7.19 MB) Report Dec 18, 2009
MPMC00033 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 6A Construction (Ref.No. Va101-1/23-1) (30.47 MB) Report Jul 10, 2009
MPMC00032 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on 2008 Annual Inspection (Ref. No. VA101-1/24-1) (9.86 MB) Report Feb 25, 2009
MPMC00031 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 5 Construction (Ref.No. Va101-1/14-1) (37.43 MB) Report Mar 27, 2008
MPMC00030 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2007 Annual Inspection (Ref.No. Va101-01/20-1) (20.55 MB) Report Dec 19, 2007
MPMC00029 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Stage 6 Design of the Tailings Storage Facility (8.49 MB) Report Jun 18, 2007
MPMC00028 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 4 Construction (Ref.No. Va101-1/10-1) (25.88 MB) Report Mar 13, 2007
MPMC00027 Mt. Polley Mine Tailings Facility Optimization Potential - Follow Up from Dam Safety Review (722.37 KB) Letter Feb 23, 2007
MPMC00026 Final Report Dam Saftey Review (2.51 MB) Report Dec 01, 2006

Pages