Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 1 - 25 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
AMEC00001 Document has been removed Report Jul 05, 1996
AMEC00002 Report on Geotechnical Investigations and Design of Open Pits (2) (765.07 KB) Report Jul 05, 1996
AMEC00003 1996 Groundwater Monitoring Well Installation Program (21.1 MB) Report Feb 07, 1997
AMEC00004 Geotechnical Review, Drainage Aspects Main Embankment Dam Tailings Storage Facility Mt. Polley Project, BC (8.86 MB) Report Mar 01, 1997
AMEC00005 Mount Polley Mine 2004 Feasibility Study (18.78 MB) Report Aug 01, 2004
AMEC00006 Mount Polley Water Balance (11.92 MB) Letter Jul 30, 2004
AMEC00007 Report on Stage 3 Construction (308.54 KB) Segment Of Report Oct 19, 2001
AMEC00008 TSF Report on 2004 Annual Inspection (550.74 KB) Report Feb 08, 2005
AMEC00009 Answers to Questions Les Galbraith to Ron Martel (24.2 KB) Outlook Email Mar 11, 2005
AMEC00010 Updated Quantities- Stage 4 Construction Volume Estimates (21.08 KB) Outlook Email May 03, 2005
AMEC00011 South dam -pre CBL and berm construction (9.58 KB) Outlook Email Jun 09, 2005
AMEC00012 Geotextile and perforated piping - Main and South Embankments (19.82 KB) Outlook Email Jun 23, 2005
AMEC00013 Correction to Geotextile and perforated piping -Main and South Embankments (19.98 KB) Outlook Email Jun 23, 2005
AMEC00014 Freeboard at Polley (13.21 KB) Outlook Email Jun 28, 2005
AMEC00015 RE: Freeboard at Polley (159.74 KB) Outlook Email Jun 29, 2005
AMEC00016 Mount Polley PAG waste rock storage (39.98 KB) Memo Jul 04, 2005
AMEC00017 Mount Polley South Embankment Sand (1.41 MB) Memo Jun 14, 2005
AMEC00018 Mount Polley Progress (11.57 KB) Outlook Email Aug 24, 2005
AMEC00019 Daily Progress at Mount Polley (1) (19.37 KB) Outlook Email Aug 26, 2005
AMEC00020 Daily Progress at Mount Polley (2) (19.36 KB) Outlook Email Aug 26, 2005
AMEC00021 RE: History of Tailings Line Leaks for Mount Polley Project (23.42 KB) Letter Aug 31, 2005
AMEC00022 RE: History of Tailings Line Leaks for Mount Polley Project (2) (23.4 KB) Letter Aug 31, 2005
AMEC00023 RE: History of Tailings Line Leaks for Mount Polley Project (3) (145.15 KB) Letter Aug 31, 2005
AMEC00024 RE Mt Polley (19.69 KB) Outlook Email Sep 12, 2005
AMEC00025 TSF Report on Stage 3C Construction (166.04 KB) Report Sep 24, 2005