Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 26 - 50 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
AMEC00026 FW Culvert Bearing Capacity (76.36 KB) Outlook Email Sep 19, 2005
AMEC00027 TSF Report on Stage 3 Construction (166.17 KB) Report Sep 23, 2005
AMEC00028 FW Log Bridge (79.33 KB) Outlook Email Sep 27, 2005
AMEC00029 RE Slope Stability Analysis (391.2 KB) Letter Oct 13, 2005
AMEC00030 RE TSF -Stage 5 Upstream Stability Analysis (89.95 KB) Letter Oct 25, 2005
AMEC00031 RE TSF -Stage 5 Upstream Stability Analysis Signed Version (142.43 KB) Letter Oct 25, 2005
AMEC00032 Mount Polley Update (6.87 MB) Letter Dec 09, 2005
AMEC00033 TSF Report on Stage 4 Construction (294.72 KB) Letter Dec 08, 2005
AMEC00034 Tailings Work (84.49 KB) Outlook Email Dec 22, 2005
AMEC00035 Mount Polley update (11.28 KB) Outlook Email Feb 14, 2006
AMEC00036 Mount Polley update (2) (11.27 KB) Outlook Email Feb 14, 2006
AMEC00037 Mount Polley Update (16.5 KB) Outlook Email Feb 15, 2006
AMEC00038 Mount Polley Updated (2) (16.5 KB) Outlook Email Feb 15, 2006
AMEC00039 Mount Polley Wight Pit Dewatering (9.36 KB) Outlook Email Feb 16, 2006
AMEC00040 Mount Polley Wight Pit Dewatering (2) (9.36 KB) Outlook Email Feb 16, 2006
AMEC00041 Mount Polley Update Frozen Till (9.66 KB) Outlook Email Feb 24, 2006
AMEC00042 Mount Polley Update Frozen Till (2) (10.04 KB) Outlook Email Feb 24, 2006
AMEC00043 Mount Polley Update (9.46 KB) Outlook Email Feb 24, 2006
AMEC00044 Mount Polley Update (9.47 KB) Outlook Email Feb 24, 2006
AMEC00045 Mount Polley Seepage Water conductivity (9.31 KB) Outlook Email Mar 02, 2005
AMEC00046 Mount Polley Seepage Water conductivity (2) (9.31 KB) Outlook Email Mar 02, 2005
AMEC00047 Water Discharge (9.45 KB) Outlook Email Mar 08, 2005
AMEC00048 RE: Zone U Samples (16.74 KB) Outlook Email Mar 10, 2006
AMEC00049 RE: Zone U Samples (2) (16.73 KB) Outlook Email Mar 10, 2006
AMEC00050 Re: Zone U Samples cont. (87.77 KB) Outlook Email Mar 10, 2006

Pages