The Post-breach Investigation Information has been divided into the following folders:
1. Independent Panel
2. Klohn Crippen Berger
3. Written Public Submissions
Documents in the Independent Panel folder include technical information from Thurber Engineering Ltd . as requested by the Panel, records of Panel meetings, presentations by Panel members and survey information.
The Klohn Crippen Berger (KCB) folder includes a geotechnical site investigation report along with other reports and lab test results from their field investigation of the breach area received by the Panel prior to December 31, 2014.
The Written Public Submissions folder contains select submissions made by the public to the Panel during the investigation.