|
AMEC00151 |
Mt Polley Cross-over notes (94.75 KB) |
Outlook Email |
Jun 01, 2012 |
|
AMEC00152 |
Mt Polley Cross-over notes (2) (87.29 KB) |
Outlook Email |
Jun 01, 2012 |
|
AMEC00153 |
Reclamation and Closure Plan Update 2004 (1.1 MB) |
Report |
Mar 01, 2005 |
|
AMEC00154 |
Predictions of Pit Lake Formation For the Springer Open Pit (15.63 MB) |
Memo |
Aug 19, 2010 |
|
AMEC00155 |
2011 Environmental and Reclaimation Report (2) (16.5 MB) |
Report |
Mar 01, 2012 |
|
AMEC00156 |
2012 Stage 8A (965.0 m) TSF Stability Analysis and Construction Drawings (22.77 KB) |
Letter |
Sep 01, 2012 |
|
AMEC00157 |
TSF 2012 Stage 8a (965m) Expansion Stability Analyses (570.64 KB) |
Report |
|
|
AMEC00158 |
2012 Stage 8A TSF Construction Drawings and Stability Analyses for Raise to El. 965m -Signed (29.71 KB) |
Memo |
Sep 10, 2012 |
|
AMEC00159 |
TSF 2012 Stage 8a (965m) Expansion Stability Analyses (676.14 KB) |
Report |
Sep 10, 2012 |
|
AMEC00160 |
2012 Stage 8A TSF Construction Drawings and Stability Analyses for Embankment Raise to El. 965m (36.15 KB) |
Memo |
Sep 10, 2012 |
|
AMEC00161 |
1996 Groundwater Monitoring Well Installation Program (2) (2.23 MB) |
Report |
Feb 07, 1997 |
|
AMEC00162 |
Geotechnical Review, Drainage Aspects Main Embankment Dam TSF Mt. Polley Project, BC (2) (10.09 MB) |
Report |
Mar 01, 1997 |
|
AMEC00163 |
Hydrogeology Assessment and Data Review (236.08 KB) |
Report |
|
|
AMEC00164 |
TSF 2012 Construction As-Built Report (944.29 KB) |
Report |
Jan 31, 2013 |
|
AMEC00165 |
Hydrogeology Assessment and Data Review (2) (319.91 KB) |
Report |
|
|
AMEC00166 |
TSF 2012 Construction As-Built Report (2) (939.66 KB) |
Report |
Jan 31, 2013 |
|
AMEC00167 |
Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m (49.29 KB) |
Memo |
Mar 08, 2013 |
|
AMEC00168 |
Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed (116.03 KB) |
Memo |
Mar 08, 2013 |
|
AMEC00169 |
Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed, edits (3.08 MB) |
Memo With Appendices |
Mar 08, 2013 |
|
AMEC00170 |
Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed, appendices (16.13 MB) |
Memo With Appendices |
Mar 08, 2013 |
|
AMEC00171 |
Hydrogeology Assessment and Data Review (3) (370.34 KB) |
Report |
|
|
AMEC00172 |
Hydrogeology Assessment and Data Review (4) (370 KB) |
Report |
|
|
AMEC00173 |
TSF Stage 8/8A 2012 As-Built Report (1.71 MB) |
Report |
Mar 15, 2013 |
|
AMEC00174 |
Hydrogeology Assessment and Data Review (5) (436.26 KB) |
Report |
Mar 01, 2013 |
|
AMEC00175 |
Hydrogeology Assessment and Data Review (6) (436.59 KB) |
Report |
Mar 01, 2013 |
|
AMEC00176 |
Hydrogeology Assessment and Data Review with appendices (7.4 MB) |
Report |
Mar 01, 2013 |
|
AMEC00177 |
TSF Stage 8/8A 2012 As-Built Report (2) (1.72 MB) |
Report |
Mar 30, 2013 |
|
AMEC00178 |
TSF Stage 8/8A 2012 As-Built Report (3) (1.72 MB) |
Report |
Mar 30, 2013 |
|
AMEC00179 |
TSF Stage 8/8A 2012 As-Built Report (4) (1.72 MB) |
Report |
Mar 30, 2013 |
|
AMEC00180 |
TSF Stage 8/8A 2012 As-Built Report (5) (1.72 MB) |
Report |
Mar 30, 2013 |
|
AMEC00181 |
TSF Stage 8/8A 2012 As-Built Report (6) (1.71 MB) |
Report |
Mar 27, 2013 |
|
AMEC00182 |
Stage 9 TSF Construction Drawings and Stability Analyses for Embankment Raise to El. 970 m (2) (49.33 KB) |
Report |
Mar 26, 2013 |
|
AMEC00183 |
Hydrogeology Assessment and Data Review (7) (439.26 KB) |
Report |
Mar 27, 2013 |
|
AMEC00184 |
TSF -Stage 9 2013 Construction Monitoring Manual (916.3 KB) |
Memo |
Apr 06, 2013 |
|
AMEC00185 |
RE MPMC 2013 CMM (269.74 KB) |
Outlook Email |
Apr 04, 2013 |
|
AMEC00186 |
RE MPMC 2013 CMM (2) (530.39 KB) |
Outlook Email |
Apr 04, 2013 |
|
AMEC00187 |
TSF -Stage 9 2013 Construction Monitoring Manual (2) (959.96 KB) |
Report |
Apr 11, 2013 |
|
AMEC00188 |
TSF -Stage 9 2013 Construction Monitoring Manual (3) (935.26 KB) |
Report |
Apr 05, 2013 |
|
AMEC00189 |
TSF -Stage 9 2013 Construction Monitoring Manual with appendices (42.11 MB) |
Report |
Apr 11, 2013 |
|
AMEC00190 |
TSF -Stage 9 2013 Construction Monitoring Manual with appendices (2) (42.1 MB) |
Report |
Apr 11, 2013 |
|
AMEC00191 |
TSF -Stage 9 2013 Construction Monitoring Manual (4) (1.09 MB) |
Report |
Apr 11, 2013 |
|
AMEC00192 |
TSF 2012 Annual Review (2) (7.79 MB) |
Report |
Apr 08, 2013 |
|
AMEC00193 |
RE Sieve Analysis (77.78 KB) |
Outlook Email |
May 29, 2013 |
|
AMEC00194 |
RE Sieve Analysis (2) (127.16 KB) |
Outlook Email |
May 29, 2013 |
|
AMEC00195 |
Document has been removed |
Outlook Email |
Jun 04, 2013 |
|
AMEC00196 |
Document has been removed |
Outlook Email |
Jun 04, 2013 |
|
AMEC00197 |
Document has been removed |
Outlook Email |
Jun 06, 2013 |
|
AMEC00198 |
Document has been removed |
Outlook Email |
Jun 06, 2013 |
|
AMEC00199 |
Document has been removed |
Memo |
Jun 25, 2013 |
|
AMEC00200 |
Document has been removed |
Outlook Email |
Jul 25, 2013 |