Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 601 - 650 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
MP00209 Tailings Storage Facility - Stage 10 (2014 Construction) (134.87 KB) Letter Jul 28, 2014
MP00210 Satellite image pre tailings dam breach on July 29 2014 (14.91 MB) Image Jul 29, 2014
MP00211 Satellite image post-tailings dam breach on August 5 2014 (14.22 MB) Image Aug 05, 2014
MP00212 Mount Polley Mine: Short Term Water Treatment/TSF Design, Joint MEM/MOE Presentation (7.77 MB) Presentation Jun 02, 2014
MP00213 Table of all Mines Act permits and permit amendments (20.57 KB) Permits Aug 05, 2014
MP00214 Complete Mines Act permit M-200 and amendments for Mount Polley Mine (5.46 MB) Permits Jun 24, 2014
MP00215 Select Mines Act permits for TSF geotechnical design, construction, operation. (4.88 MB) Permits Aug 09, 2013
MP00216 Mount Polley Geotechnical Inspection - August 30, 2006 (89.79 KB) Inspection Report Oct 05, 2006
MP00217 Mount Polley Mine Tailings Storage Facility Stage 8/8A 2012 As-Built Report (26.82 MB) Report Mar 27, 2013
MP00218 Geotechnical Inspection Report - Mt. Polley Mine April 25, 2001 (251.54 KB) Letter May 21, 2001
MP00219 Document has been removed Letter Jul 30, 1996
MP00220 Document has been removed Letter Jul 29, 1996
MP00221 Mount Polley Mine - 2012 Tailings Construction (215.29 KB) Email Jun 27, 2012
MP00222 Mount Polley TSF Stage 6 Permit (21.29 KB) Email Dec 10, 2007
MP00223 Mount Polley Mine - 2012 Tailings Construction [Additional Raise] (151.77 KB) Email Sep 19, 2012
MP00224 Mount Polley Mine - 2012 Tailings Construction [Additional Raise] (88 KB) Email Sep 19, 2012
MP00225 Mount Polley Stage 6 TSF design (1.02 MB) Letter Dec 19, 2007
MP00226 Stage 6 Design Report for the Tailings Storage Facility - Mount Polley Mine (20.19 KB) Letter Jul 04, 2007
MP00227 M-200 Mine Permit Amendment Application (Water Treatment Plant) (3.57 MB) Report Jul 29, 2014
MP00228 2013 Site Water Balance (77.47 KB) Table Oct 01, 2012
MP00229 Mine Permit Amendment Application (91.93 MB) Report Nov 01, 2010
MP00230 2013 Construction Monitoring Manual + 2012 As-Built + 2012 Annual Review (158.12 KB) Email Apr 18, 2013
MP00231 Teck - CMO 2012 Annual Pit Slope Stability review (440.18 KB) Email Apr 30, 2013
MP00232 Request: OMS and Water Balance Status (64.71 KB) Email May 07, 2014
MP00233 Request: OMS and Water Balance Status (87.89 KB) Email May 08, 2013
MP00234 Request: OMS and Water Balance Status (90.86 KB) Email May 17, 2013
MP00235 Request: OMS and Water Balance Status (67.95 KB) Email May 21, 2013
MP00236 Mt Polley/Haul Road and PAG Dump Amendment (164.65 KB) Email May 30, 2013
MP00237 Mt Polley/Haul Road and PAG Dump Amendment (175.31 KB) Email May 30, 2013
MP00238 Request: OMS (132.74 KB) Email Jul 29, 2013
MP00239 Mount Polley Mine Tailings Storage Facility Stage 9 2013 As-Built and Annual Review Report (116.63 KB) Email Apr 01, 2014
MP00240 Mount Polley Mine Tailings Facility Stage 9 2013 As-Built and Annual Review Report (149.09 KB) Email Mar 31, 2014
MP00241 Tailings Storage Facility, 2007 Annual Inspection (35.61 KB) Letter Apr 22, 2008
MP00242 Untitled (31.23 KB) Letter Mar 16, 2010
MP00243 Key Design Reports and Engineers Involved with Mount Polley TSF (21.66 KB) Table Aug 25, 2014
MP10000 Document has been removed Logs Apr 16, 2013
MP10001 Document has been removed Logs Jan 01, 2014
MP10002 Document has been removed Photos May 12, 2013
MP10003 1990 Feasibility Study - Geotechnical and Tailings Disposal (4.43 MB) Report Jun 01, 1990
MP10004 1995 Knight Piesold TSF Design Report (original design) (18.11 MB) Report May 26, 1995
MP10005 1996 GS Monitoring Installation (KP) (2.11 MB) Report Feb 07, 1997
MP10006 Instrumentation Triggers (2013 AMEC Construction Manual) (54.34 KB) Report Apr 11, 2013
MP10007 1997 Geotechnical Review Darinage Aspects Main Embankment Dam (MAJM) (8.26 MB) Report Mar 01, 1997
MP10008 1997 Geological Investigation Drawings (KP) (6.93 MB) Drawings May 16, 1997
MP10009 1997 TSF Updated Design Reprot (KP) (10.7 MB) Report Jun 06, 1997
MP10010 Instrumentation Data (Piezo and SI) (5.75 MB) Data Jul 01, 1996
MP10011 1996 KP Geotech Investigations (8.16 MB) Report Jul 05, 1996
MP10012 2011 TSF Site Investigation Report (AMEC) (82.61 MB) Report Mar 28, 2012
MP10013 Document has been removed Report Aug 13, 2014
MP10014 QA (Offsite Sampling Tracking Table) (24.11 KB) Data

Pages