AMEC00001 |
Document has been removed |
Report |
Jul 05, 1996 |
AMEC00002 |
Report on Geotechnical Investigations and Design of Open Pits (2) (765.07 KB) |
Report |
Jul 05, 1996 |
AMEC00003 |
1996 Groundwater Monitoring Well Installation Program (21.1 MB) |
Report |
Feb 07, 1997 |
AMEC00004 |
Geotechnical Review, Drainage Aspects Main Embankment Dam Tailings Storage Facility Mt. Polley Project, BC (8.86 MB) |
Report |
Mar 01, 1997 |
AMEC00005 |
Mount Polley Mine 2004 Feasibility Study (18.78 MB) |
Report |
Aug 01, 2004 |
AMEC00006 |
Mount Polley Water Balance (11.92 MB) |
Letter |
Jul 30, 2004 |
AMEC00007 |
Report on Stage 3 Construction (308.54 KB) |
Segment Of Report |
Oct 19, 2001 |
AMEC00008 |
TSF Report on 2004 Annual Inspection (550.74 KB) |
Report |
Feb 08, 2005 |
AMEC00009 |
Answers to Questions Les Galbraith to Ron Martel (24.2 KB) |
Outlook Email |
Mar 11, 2005 |
AMEC00010 |
Updated Quantities- Stage 4 Construction Volume Estimates (21.08 KB) |
Outlook Email |
May 03, 2005 |
AMEC00011 |
South dam -pre CBL and berm construction (9.58 KB) |
Outlook Email |
Jun 09, 2005 |
AMEC00012 |
Geotextile and perforated piping - Main and South Embankments (19.82 KB) |
Outlook Email |
Jun 23, 2005 |
AMEC00013 |
Correction to Geotextile and perforated piping -Main and South Embankments (19.98 KB) |
Outlook Email |
Jun 23, 2005 |
AMEC00014 |
Freeboard at Polley (13.21 KB) |
Outlook Email |
Jun 28, 2005 |
AMEC00015 |
RE: Freeboard at Polley (159.74 KB) |
Outlook Email |
Jun 29, 2005 |
AMEC00016 |
Mount Polley PAG waste rock storage (39.98 KB) |
Memo |
Jul 04, 2005 |
AMEC00017 |
Mount Polley South Embankment Sand (1.41 MB) |
Memo |
Jun 14, 2005 |
AMEC00018 |
Mount Polley Progress (11.57 KB) |
Outlook Email |
Aug 24, 2005 |
AMEC00019 |
Daily Progress at Mount Polley (1) (19.37 KB) |
Outlook Email |
Aug 26, 2005 |
AMEC00020 |
Daily Progress at Mount Polley (2) (19.36 KB) |
Outlook Email |
Aug 26, 2005 |
AMEC00021 |
RE: History of Tailings Line Leaks for Mount Polley Project (23.42 KB) |
Letter |
Aug 31, 2005 |
AMEC00022 |
RE: History of Tailings Line Leaks for Mount Polley Project (2) (23.4 KB) |
Letter |
Aug 31, 2005 |
AMEC00023 |
RE: History of Tailings Line Leaks for Mount Polley Project (3) (145.15 KB) |
Letter |
Aug 31, 2005 |
AMEC00024 |
RE Mt Polley (19.69 KB) |
Outlook Email |
Sep 12, 2005 |
AMEC00025 |
TSF Report on Stage 3C Construction (166.04 KB) |
Report |
Sep 24, 2005 |
AMEC00026 |
FW Culvert Bearing Capacity (76.36 KB) |
Outlook Email |
Sep 19, 2005 |
AMEC00027 |
TSF Report on Stage 3 Construction (166.17 KB) |
Report |
Sep 23, 2005 |
AMEC00028 |
FW Log Bridge (79.33 KB) |
Outlook Email |
Sep 27, 2005 |
AMEC00029 |
RE Slope Stability Analysis (391.2 KB) |
Letter |
Oct 13, 2005 |
AMEC00030 |
RE TSF -Stage 5 Upstream Stability Analysis (89.95 KB) |
Letter |
Oct 25, 2005 |
AMEC00031 |
RE TSF -Stage 5 Upstream Stability Analysis Signed Version (142.43 KB) |
Letter |
Oct 25, 2005 |
AMEC00032 |
Mount Polley Update (6.87 MB) |
Letter |
Dec 09, 2005 |
AMEC00033 |
TSF Report on Stage 4 Construction (294.72 KB) |
Letter |
Dec 08, 2005 |
AMEC00034 |
Tailings Work (84.49 KB) |
Outlook Email |
Dec 22, 2005 |
AMEC00035 |
Mount Polley update (11.28 KB) |
Outlook Email |
Feb 14, 2006 |
AMEC00036 |
Mount Polley update (2) (11.27 KB) |
Outlook Email |
Feb 14, 2006 |
AMEC00037 |
Mount Polley Update (16.5 KB) |
Outlook Email |
Feb 15, 2006 |
AMEC00038 |
Mount Polley Updated (2) (16.5 KB) |
Outlook Email |
Feb 15, 2006 |
AMEC00039 |
Mount Polley Wight Pit Dewatering (9.36 KB) |
Outlook Email |
Feb 16, 2006 |
AMEC00040 |
Mount Polley Wight Pit Dewatering (2) (9.36 KB) |
Outlook Email |
Feb 16, 2006 |
AMEC00041 |
Mount Polley Update Frozen Till (9.66 KB) |
Outlook Email |
Feb 24, 2006 |
AMEC00042 |
Mount Polley Update Frozen Till (2) (10.04 KB) |
Outlook Email |
Feb 24, 2006 |
AMEC00043 |
Mount Polley Update (9.46 KB) |
Outlook Email |
Feb 24, 2006 |
AMEC00044 |
Mount Polley Update (9.47 KB) |
Outlook Email |
Feb 24, 2006 |
AMEC00045 |
Mount Polley Seepage Water conductivity (9.31 KB) |
Outlook Email |
Mar 02, 2005 |
AMEC00046 |
Mount Polley Seepage Water conductivity (2) (9.31 KB) |
Outlook Email |
Mar 02, 2005 |
AMEC00047 |
Water Discharge (9.45 KB) |
Outlook Email |
Mar 08, 2005 |
AMEC00048 |
RE: Zone U Samples (16.74 KB) |
Outlook Email |
Mar 10, 2006 |
AMEC00049 |
RE: Zone U Samples (2) (16.73 KB) |
Outlook Email |
Mar 10, 2006 |
AMEC00050 |
Re: Zone U Samples cont. (87.77 KB) |
Outlook Email |
Mar 10, 2006 |
AMEC00051 |
Re: Zone U Samples cont. (2) (87.4 KB) |
Outlook Email |
Mar 10, 2006 |
AMEC00052 |
RE Depth of Inclinometers (80.12 KB) |
Outlook Email |
Mar 17, 2006 |
AMEC00053 |
PE DS toe drain design change (8.75 KB) |
Outlook Email |
Mar 21, 2006 |
AMEC00054 |
PE DS toe drain design change (2) (9.14 KB) |
Outlook Email |
Mar 21, 2006 |
AMEC00055 |
RE PE DS toe drain design change (79.5 KB) |
Outlook Email |
Mar 21, 2006 |
AMEC00056 |
RE PE DS toe drain design change (2) (79.88 KB) |
Outlook Email |
Mar 21, 2006 |
AMEC00057 |
RE PE DS toe drain design change cont (146.27 KB) |
Outlook Email |
Mar 22, 2006 |
AMEC00058 |
RE PE DS toe drain design change cont (2) (146.28 KB) |
Outlook Email |
Mar 22, 2006 |
AMEC00059 |
ME Geotextile figure and test holes (9.18 KB) |
Outlook Email |
Mar 22, 2006 |
AMEC00060 |
ME Geotextile figure and test holes (2) (9.18 KB) |
Outlook Email |
Mar 22, 2006 |
AMEC00061 |
Wight Pit road photos (9.2 KB) |
Outlook Email |
Mar 24, 2006 |
AMEC00062 |
Wight Pit road photos (2) (9.21 KB) |
Outlook Email |
Mar 24, 2006 |
AMEC00063 |
Zone C Tracking (13.27 KB) |
Outlook Email |
Mar 28, 2006 |
AMEC00064 |
Zone C Tracking cont (12.37 KB) |
Outlook Email |
Mar 29, 2006 |
AMEC00065 |
Inclinometer installation guide (12.93 KB) |
Outlook Email |
Mar 29, 2006 |
AMEC00066 |
RE March 27 to April 2 Report -Stage 4 Construction (86.09 KB) |
Outlook Email |
Apr 04, 2006 |
AMEC00067 |
RE Drill rig booked for Monday May 8th (154.95 KB) |
Outlook Email |
Apr 07, 2006 |
AMEC00068 |
Zone F (12.86 KB) |
Outlook Email |
Apr 07, 2006 |
AMEC00069 |
RE: Time Sheets (77.3 KB) |
Outlook Email |
Apr 13, 2006 |
AMEC00070 |
RE Draft Weekly Apr 3 to Apr 9 - Mt Polley (76.9 KB) |
Outlook Email |
Apr 18, 2006 |
AMEC00071 |
Pizometers (12.65 KB) |
Outlook Email |
Apr 19, 2006 |
AMEC00072 |
TSF Report on 2005 Annual Inspection (542.35 KB) |
Report |
May 03, 2006 |
AMEC00073 |
TSF Report on 2005 Annual Inspection (2) (274.57 KB) |
Report |
May 03, 2006 |
AMEC00074 |
Mt Polley Mine - Review of Tailings (119.84 KB) |
Memo |
Nov 25, 2005 |
AMEC00075 |
Foundation Drain (38.17 KB) |
Outlook Email |
|
AMEC00076 |
Toe Drain (40.49 KB) |
Outlook Email |
|
AMEC00077 |
RE Basin Till Liner (73.9 KB) |
Outlook Email |
Jul 28, 2006 |
AMEC00078 |
Geotechnical Review, Drainage Aspects, Main Embankment Dam, TSF (19.49 MB) |
Report |
|
AMEC00079 |
Preliminary Design of the TSF to its Ultimate Elevation (274.89 KB) |
Report |
Mar 08, 2005 |
AMEC00080 |
OMS Manual (325.39 KB) |
Report |
Oct 06, 2006 |
AMEC00081 |
DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (623.9 KB) |
Report |
Nov 01, 2006 |
AMEC00082 |
DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (2) (1.06 MB) |
Report |
Nov 01, 2006 |
AMEC00083 |
DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (3) (1.79 MB) |
Report |
Nov 01, 2006 |
AMEC00084 |
November 1 Site Visit by Les Galbraith (36.23 KB) |
Memo |
Nov 20, 2006 |
AMEC00085 |
DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (4) (1.67 MB) |
Report |
Nov 01, 2006 |
AMEC00086 |
DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (5) (1.68 MB) |
Report |
Nov 01, 2006 |
AMEC00087 |
DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (6) (1.7 MB) |
Report |
Nov 01, 2006 |
AMEC00088 |
Mount Polley South Embankment Sand (1.41 MB) |
Memo |
Jun 14, 2005 |
AMEC00089 |
DRAFT Mt Polley TSF Optimization Potential (235.4 KB) |
Report |
Feb 01, 2007 |
AMEC00090 |
DRAFT Mt Polley TSF Optimization Potential (2) (168.81 KB) |
Report |
Feb 23, 2007 |
AMEC00091 |
DRAFT Mt Polley TSF Optimization Potential (3) (127.54 KB) |
Report |
Feb 26, 2007 |
AMEC00092 |
DRAFT Mt Polley TSF Optimization Potential (4) (255.77 KB) |
Report |
Feb 26, 2007 |
AMEC00093 |
Report on Stage 4 Construction (903.04 KB) |
Report |
Mar 13, 2007 |
AMEC00094 |
Efficiency of Tailings Sand Operations (71.02 KB) |
Report |
|
AMEC00095 |
Efficiency of Tailings Sand Cat Operations (43.14 KB) |
Summary Sheet |
Jun 04, 2008 |
AMEC00096 |
Efficiency of Tailings Construction Operations (193.48 KB) |
Report |
Jun 10, 2008 |
AMEC00097 |
Efficiency of Tailings Construction Operations (2) (196.04 KB) |
Report |
Jun 10, 2008 |
AMEC00098 |
Efficiency of Tailings Construction Operations (3) (16.6 MB) |
Report |
Jun 10, 2008 |
AMEC00099 |
Efficiency of Tailings Construction Operations (4) (931.36 KB) |
Report |
Jun 10, 2008 |
AMEC00100 |
Efficiency of Tailings Construction Operations (5) (180 KB) |
Report |
Jun 10, 2008 |