Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 601 - 625 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
MP00209 Tailings Storage Facility - Stage 10 (2014 Construction) (134.87 KB) Letter Jul 28, 2014
MP00210 Satellite image pre tailings dam breach on July 29 2014 (14.91 MB) Image Jul 29, 2014
MP00211 Satellite image post-tailings dam breach on August 5 2014 (14.22 MB) Image Aug 05, 2014
MP00212 Mount Polley Mine: Short Term Water Treatment/TSF Design, Joint MEM/MOE Presentation (7.77 MB) Presentation Jun 02, 2014
MP00213 Table of all Mines Act permits and permit amendments (20.57 KB) Permits Aug 05, 2014
MP00214 Complete Mines Act permit M-200 and amendments for Mount Polley Mine (5.46 MB) Permits Jun 24, 2014
MP00215 Select Mines Act permits for TSF geotechnical design, construction, operation. (4.88 MB) Permits Aug 09, 2013
MP00216 Mount Polley Geotechnical Inspection - August 30, 2006 (89.79 KB) Inspection Report Oct 05, 2006
MP00217 Mount Polley Mine Tailings Storage Facility Stage 8/8A 2012 As-Built Report (26.82 MB) Report Mar 27, 2013
MP00218 Geotechnical Inspection Report - Mt. Polley Mine April 25, 2001 (251.54 KB) Letter May 21, 2001
MP00219 Document has been removed Letter Jul 30, 1996
MP00220 Document has been removed Letter Jul 29, 1996
MP00221 Mount Polley Mine - 2012 Tailings Construction (215.29 KB) Email Jun 27, 2012
MP00222 Mount Polley TSF Stage 6 Permit (21.29 KB) Email Dec 10, 2007
MP00223 Mount Polley Mine - 2012 Tailings Construction [Additional Raise] (151.77 KB) Email Sep 19, 2012
MP00224 Mount Polley Mine - 2012 Tailings Construction [Additional Raise] (88 KB) Email Sep 19, 2012
MP00225 Mount Polley Stage 6 TSF design (1.02 MB) Letter Dec 19, 2007
MP00226 Stage 6 Design Report for the Tailings Storage Facility - Mount Polley Mine (20.19 KB) Letter Jul 04, 2007
MP00227 M-200 Mine Permit Amendment Application (Water Treatment Plant) (3.57 MB) Report Jul 29, 2014
MP00228 2013 Site Water Balance (77.47 KB) Table Oct 01, 2012
MP00229 Mine Permit Amendment Application (91.93 MB) Report Nov 01, 2010
MP00230 2013 Construction Monitoring Manual + 2012 As-Built + 2012 Annual Review (158.12 KB) Email Apr 18, 2013
MP00231 Teck - CMO 2012 Annual Pit Slope Stability review (440.18 KB) Email Apr 30, 2013
MP00232 Request: OMS and Water Balance Status (64.71 KB) Email May 07, 2014
MP00233 Request: OMS and Water Balance Status (87.89 KB) Email May 08, 2013

Pages