Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 226 - 250 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
MP00115 Letter covering submission of 3 reports, Dec. 13, 16 and 23, 1999 (128.28 KB) Letter Feb 04, 2000
AMEC00328 Document has been removed Letter Jul 04, 2014
MP00126 Mt. Polley Storage Facility and Ancillary Works, Report on 2000 and 2001 Annual Inspection Permit M-200 (114.5 KB) Letter Oct 09, 2001
KP00042 Response to MEM Order (748.58 KB) Letter Oct 10, 2014
KP00021 Revised Scope of Work and Budget for TSF Stage 6 (174.83 KB) Letter Mar 05, 2007
MPMC00103 Mount Polley Water Balance (3.55 MB) Letter Jul 30, 2004
AMEC00031 RE TSF -Stage 5 Upstream Stability Analysis Signed Version (142.43 KB) Letter Oct 25, 2005
MP00225 Mount Polley Stage 6 TSF design (1.02 MB) Letter Dec 19, 2007
MP10035 Mt. Polley Mine Tailings Facility Optimization Potential - Follow Up from Dam Safety Review (713.06 KB) Letter Feb 23, 2007
MP00204 Document has been removed Letter Jul 18, 2014
AMEC00106 Capacity of the Existing Mine Tailings Pipeline (402.91 KB) Letter Jul 24, 2008
MP00056 Mt. Polley Tailings Dam (70.38 KB) Letter Sep 05, 1995
MP00127 Mt. Polley Mine Tailings Storage Facility, Report on Stage 3 Construction Permit M-200 (125.2 KB) Letter Oct 25, 2001
AMEC00021 RE: History of Tailings Line Leaks for Mount Polley Project (23.42 KB) Letter Aug 31, 2005
MP00099 Application for License to Discharge Tailings (27.45 KB) Letter Jun 03, 1997
KP00022 Hydrology Review for Hazeltine Creek, Station W7 (432.02 KB) Letter Jun 03, 2007
AMEC00032 Mount Polley Update (6.87 MB) Letter Dec 09, 2005
MP00226 Stage 6 Design Report for the Tailings Storage Facility - Mount Polley Mine (20.19 KB) Letter Jul 04, 2007
MP00057 Mt. Polley Tailings Storage Facility Sediment Pond (5.16 MB) Letter Sep 14, 1995
MP00117 Mt. Polley Mining Corp Tailings Storage Facility Cyclone Sand Review (242.95 KB) Letter Feb 16, 2000
MP00128 Annual Dam Safety Inspection Report and Operations Manual (75.14 KB) Letter Apr 22, 2002
AMEC00022 RE: History of Tailings Line Leaks for Mount Polley Project (2) (23.4 KB) Letter Aug 31, 2005
MP00195 Document has been removed Letter Jun 06, 2014
MP00107 Tailings Storage Facility Annual Report 1997 (61.72 KB) Letter Apr 23, 1999
KP00023 Upstream Toe Drain Seepage Estimations (581.13 KB) Letter Mar 14, 2007

Pages