Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 701 - 725 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
AMEC00272 RE Daily Construction Report (107.54 KB) Outlook Email Jul 12, 2011
AMEC00320 Document has been removed Outlook Email Jun 20, 2014
AMEC00077 RE Basin Till Liner (73.9 KB) Outlook Email Jul 28, 2006
AMEC00335 Mount Polley Mine - Water Management Plan (156.45 KB) Outlook Email Jul 18, 2014
AMEC00194 RE Sieve Analysis (2) (127.16 KB) Outlook Email May 29, 2013
AMEC00045 Mount Polley Seepage Water conductivity (9.31 KB) Outlook Email Mar 02, 2005
AMEC00013 Correction to Geotextile and perforated piping -Main and South Embankments (19.98 KB) Outlook Email Jun 23, 2005
AMEC00062 Wight Pit road photos (2) (9.21 KB) Outlook Email Mar 24, 2006
AMEC00289 Back to design at corner 4 - Mt. Polley (74.95 KB) Outlook Email Jul 27, 2012
AMEC00195 Document has been removed Outlook Email Jun 04, 2013
AMEC00046 Mount Polley Seepage Water conductivity (2) (9.31 KB) Outlook Email Mar 02, 2005
AMEC00014 Freeboard at Polley (13.21 KB) Outlook Email Jun 28, 2005
AMEC00160 2012 Stage 8A TSF Construction Drawings and Stability Analyses for Embankment Raise to El. 965m (36.15 KB) Memo Sep 10, 2012
MPMC00105 Document has been removed Memo Jun 18, 2013
AMEC00016 Mount Polley PAG waste rock storage (39.98 KB) Memo Jul 04, 2005
AMEC00017 Mount Polley South Embankment Sand (1.41 MB) Memo Jun 14, 2005
MPMC00106 Document has been removed Memo Jul 25, 2013
MPMC00107 Document has been removed Memo Oct 22, 2013
MP00067 Geotechncial Information Obtained from 1996 Borehole Investigation (2.02 MB) Memo Jul 26, 1996
AMEC00199 Document has been removed Memo Jun 25, 2013
AMEC00167 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m (49.29 KB) Memo Mar 08, 2013
AMEC00184 TSF -Stage 9 2013 Construction Monitoring Manual (916.3 KB) Memo Apr 06, 2013
MPMC00108 Document has been removed Memo Nov 27, 2013
MP00068 Borehole Logs for PRW 96-1 to 4 (317.96 KB) Memo Jul 30, 1996
AMEC00168 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed (116.03 KB) Memo Mar 08, 2013

Pages