Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 201 - 250 of 847
View: 25 | 50 | 100
Document ID Title Typesort ascending Published
AMEC00059 ME Geotextile figure and test holes (9.18 KB) Outlook Email Mar 22, 2006
AMEC00315 RE Daily Report 2014-06-09, SI's 2014-06-08 (88.89 KB) Outlook Email Jun 10, 2014
AMEC00283 Mt.Polley Instrumentation Installation Package part 2 (67.71 KB) Outlook Email Jul 10, 2011
AMEC00075 Foundation Drain (38.17 KB) Outlook Email
AMEC00331 RE. Corner 5 possible realignment (114.34 KB) Outlook Email Jul 16, 2014
AMEC00044 Mount Polley Update (9.47 KB) Outlook Email Feb 24, 2006
AMEC00300 RE Hydrological Data (82.06 KB) Outlook Email Jan 02, 2013
AMEC00012 Geotextile and perforated piping - Main and South Embankments (19.82 KB) Outlook Email Jun 23, 2005
AMEC00060 ME Geotextile figure and test holes (2) (9.18 KB) Outlook Email Mar 22, 2006
AMEC00316 Document has been removed Outlook Email Jun 12, 2014
AMEC00028 FW Log Bridge (79.33 KB) Outlook Email Sep 27, 2005
AMEC00284 RE Slope Inclinometers Survey (131.58 KB) Outlook Email Jan 19, 2012
AMEC00076 Toe Drain (40.49 KB) Outlook Email
AMEC00045 Mount Polley Seepage Water conductivity (9.31 KB) Outlook Email Mar 02, 2005
AMEC00301 RE Field Investigation Summary (133.96 KB) Outlook Email Jun 06, 2013
AMEC00013 Correction to Geotextile and perforated piping -Main and South Embankments (19.98 KB) Outlook Email Jun 23, 2005
AMEC00061 Wight Pit road photos (9.2 KB) Outlook Email Mar 24, 2006
AMEC00285 RE Impoundment Stability (105.58 KB) Outlook Email Jun 05, 2012
AMEC00077 RE Basin Till Liner (73.9 KB) Outlook Email Jul 28, 2006
AMEC00046 Mount Polley Seepage Water conductivity (2) (9.31 KB) Outlook Email Mar 02, 2005
AMEC00302 Corner 2 borrow (90.12 KB) Outlook Email Jun 07, 2013
AMEC00014 Freeboard at Polley (13.21 KB) Outlook Email Jun 28, 2005
AMEC00270 RE Daily Construction Report (97.6 KB) Outlook Email Jul 12, 2011
AMEC00062 Wight Pit road photos (2) (9.21 KB) Outlook Email Mar 24, 2006
AMEC00318 Document has been removed Outlook Email Jun 13, 2014
AMEC00286 RE flyover topo (101.71 KB) Outlook Email Jun 20, 2012
AMEC00206 RE 2013 Monthly Elevations - December (145.24 KB) Outlook Email Feb 20, 2014
AMEC00334 RE TSF Water Management Plan (200.49 KB) Outlook Email Jul 16, 2014
AMEC00047 Water Discharge (9.45 KB) Outlook Email Mar 08, 2005
AMEC00303 RE June.19 Daily Report (93.23 KB) Outlook Email Jun 20, 2013
AMEC00223 Document has been removed Outlook Email Jul 15, 2014
AMEC00015 RE: Freeboard at Polley (159.74 KB) Outlook Email Jun 29, 2005
AMEC00063 Zone C Tracking (13.27 KB) Outlook Email Mar 28, 2006
AMEC00287 Mount Polley TSF Density tests (80.21 KB) Outlook Email Jul 02, 2012
AMEC00335 Mount Polley Mine - Water Management Plan (156.45 KB) Outlook Email Jul 18, 2014
AMEC00048 RE: Zone U Samples (16.74 KB) Outlook Email Mar 10, 2006
AMEC00224 Document has been removed Outlook Email Jul 22, 2014
AMEC00272 RE Daily Construction Report (107.54 KB) Outlook Email Jul 12, 2011
AMEC00064 Zone C Tracking cont (12.37 KB) Outlook Email Mar 29, 2006
AMEC00320 Document has been removed Outlook Email Jun 20, 2014
AMEC00208 2013 Monthly Elevations - December (145.32 KB) Outlook Email Feb 20, 2014
AMEC00049 RE: Zone U Samples (2) (16.73 KB) Outlook Email Mar 10, 2006
AMEC00065 Inclinometer installation guide (12.93 KB) Outlook Email Mar 29, 2006
AMEC00193 RE Sieve Analysis (77.78 KB) Outlook Email May 29, 2013
AMEC00289 Back to design at corner 4 - Mt. Polley (74.95 KB) Outlook Email Jul 27, 2012
AMEC00337 RE 2014-07-20 Filter sampling (FS14-26), Daily Report (87.19 KB) Outlook Email Jul 21, 2014
AMEC00338 RE Daily Report - July 27, 2014 (87.34 KB) Outlook Email Jul 28, 2014
AMEC00130 FW Settling test using Glacial till (61.21 KB) Outlook Email Oct 26, 2011
AMEC00050 Re: Zone U Samples cont. (87.77 KB) Outlook Email Mar 10, 2006
AMEC00306 Filter and Transition testing (107.6 KB) Outlook Email Jun 25, 2013

Pages