Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 101 - 150 of 847
View: 25 | 50 | 100
Document ID Title Typesort ascending Published
AMEC00256 TSF - Stage 8 2012 Construction Monitoring Manual (1.67 MB) Binder- Report Mar 30, 2012
AMEC00169 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed, edits (3.08 MB) Memo With Appendices Mar 08, 2013
AMEC00170 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed, appendices (16.13 MB) Memo With Appendices Mar 08, 2013
MP00059 Mt. Polley Site Inspection (2.9 MB) Memo Oct 02, 1995
MP00060 Mt. Polley Site Inspection (5.99 MB) Memo Oct 06, 1995
AMEC00084 November 1 Site Visit by Les Galbraith (36.23 KB) Memo Nov 20, 2006
AMEC00199 Document has been removed Memo Jun 25, 2013
MP00063 Mt. Polley Tailings Construction Schedule (77.44 KB) Memo Jun 05, 1996
AMEC00167 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m (49.29 KB) Memo Mar 08, 2013
BGC00002 Document has been removed Memo Jun 18, 2013
AMEC00184 TSF -Stage 9 2013 Construction Monitoring Manual (916.3 KB) Memo Apr 06, 2013
KP00012 Site Visit Memo Nov1 (26.93 KB) Memo Nov 20, 2006
AMEC00168 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed (116.03 KB) Memo Mar 08, 2013
AMEC00088 Mount Polley South Embankment Sand (1.41 MB) Memo Jun 14, 2005
BGC00003 Document has been removed Memo Jul 25, 2013
MPMC00105 Document has been removed Memo Jun 18, 2013
BGC00004 Document has been removed Memo Oct 22, 2013
MPMC00106 Document has been removed Memo Jul 25, 2013
AMEC00154 Predictions of Pit Lake Formation For the Springer Open Pit (15.63 MB) Memo Aug 19, 2010
AMEC00074 Mt Polley Mine - Review of Tailings (119.84 KB) Memo Nov 25, 2005
BGC00005 Document has been removed Memo Nov 27, 2013
MPMC00107 Document has been removed Memo Oct 22, 2013
MP00067 Geotechncial Information Obtained from 1996 Borehole Investigation (2.02 MB) Memo Jul 26, 1996
MPMC00108 Document has been removed Memo Nov 27, 2013
MP00068 Borehole Logs for PRW 96-1 to 4 (317.96 KB) Memo Jul 30, 1996
AMEC00220 Document has been removed Memo
AMEC00221 Document has been removed Memo
MPMC00110 Mount Polley Water Balance Model - Review Comments (217.88 KB) Memo May 15, 2014
AMEC00158 2012 Stage 8A TSF Construction Drawings and Stability Analyses for Raise to El. 965m -Signed (29.71 KB) Memo Sep 10, 2012
AMEC00222 Document has been removed Memo Jun 12, 2014
MPMC00111 TSF Stage 10 Crest Elevation Design Criteria (47.87 KB) Memo Jun 09, 2014
AMEC00016 Mount Polley PAG waste rock storage (39.98 KB) Memo Jul 04, 2005
AMEC00160 2012 Stage 8A TSF Construction Drawings and Stability Analyses for Embankment Raise to El. 965m (36.15 KB) Memo Sep 10, 2012
MP10036 Mount Polley Tailings Storage Facility, Stage 9 2013 Construction Monitoring Manual Clarification (Zone S Compaction Specifications) (37.09 KB) Memo Jun 06, 2013
AMEC00017 Mount Polley South Embankment Sand (1.41 MB) Memo Jun 14, 2005
AMEC00018 Mount Polley Progress (11.57 KB) Outlook Email Aug 24, 2005
AMEC00066 RE March 27 to April 2 Report -Stage 4 Construction (86.09 KB) Outlook Email Apr 04, 2006
AMEC00194 RE Sieve Analysis (2) (127.16 KB) Outlook Email May 29, 2013
AMEC00322 Document has been removed Outlook Email Jun 27, 2014
AMEC00034 Tailings Work (84.49 KB) Outlook Email Dec 22, 2005
AMEC00338 RE Daily Report - July 27, 2014 (87.34 KB) Outlook Email Jul 28, 2014
AMEC00130 FW Settling test using Glacial till (61.21 KB) Outlook Email Oct 26, 2011
AMEC00050 Re: Zone U Samples cont. (87.77 KB) Outlook Email Mar 10, 2006
AMEC00306 Filter and Transition testing (107.6 KB) Outlook Email Jun 25, 2013
AMEC00019 Daily Progress at Mount Polley (1) (19.37 KB) Outlook Email Aug 26, 2005
AMEC00275 RE Construction Daily Report (94.59 KB) Outlook Email Jul 15, 2011
AMEC00067 RE Drill rig booked for Monday May 8th (154.95 KB) Outlook Email Apr 07, 2006
AMEC00195 Document has been removed Outlook Email Jun 04, 2013
AMEC00035 Mount Polley update (11.28 KB) Outlook Email Feb 14, 2006
AMEC00291 RE Daily Report (92.46 KB) Outlook Email Aug 20, 2012

Pages