Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 601 - 650 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
AMEC00056 RE PE DS toe drain design change (2) (79.88 KB) Outlook Email Mar 21, 2006
AMEC00312 Mt. Polley Instruments (73.84 KB) Outlook Email Nov 07, 2013
AMEC00024 RE Mt Polley (19.69 KB) Outlook Email Sep 12, 2005
AMEC00152 Mt Polley Cross-over notes (2) (87.29 KB) Outlook Email Jun 01, 2012
AMEC00280 RE Construction Testing (112.54 KB) Outlook Email Aug 09, 2011
AMEC00200 Document has been removed Outlook Email Jul 25, 2013
AMEC00041 Mount Polley Update Frozen Till (9.66 KB) Outlook Email Feb 24, 2006
AMEC00297 RE Hydrological Data (82.82 KB) Outlook Email Jan 02, 2013
AMEC00217 Proposed Construction Plan (67.55 KB) Outlook Email Jun 05, 2014
AMEC00009 Answers to Questions Les Galbraith to Ron Martel (24.2 KB) Outlook Email Mar 11, 2005
AMEC00057 RE PE DS toe drain design change cont (146.27 KB) Outlook Email Mar 22, 2006
AMEC00185 RE MPMC 2013 CMM (269.74 KB) Outlook Email Apr 04, 2013
AMEC00313 RE Instrumentation and construction (133.14 KB) Outlook Email Dec 16, 2013
AMEC00281 Monitoring Wells (88.22 KB) Outlook Email Oct 12, 2011
AMEC00201 RE Daily Report -July 24 2013 (2) (82.64 KB) Outlook Email Jul 25, 2013
AMEC00329 Document has been removed Outlook Email Jul 10, 2014
AMEC00042 Mount Polley Update Frozen Till (2) (10.04 KB) Outlook Email Feb 24, 2006
AMEC00218 Proposed Construction Plan (2) (65.8 KB) Outlook Email Jun 05, 2014
AMEC00010 Updated Quantities- Stage 4 Construction Volume Estimates (21.08 KB) Outlook Email May 03, 2005
AMEC00058 RE PE DS toe drain design change cont (2) (146.28 KB) Outlook Email Mar 22, 2006
AMEC00186 RE MPMC 2013 CMM (2) (530.39 KB) Outlook Email Apr 04, 2013
AMEC00314 2013 Monthly Elevations - December (176.46 KB) Outlook Email Feb 20, 2014
AMEC00026 FW Culvert Bearing Capacity (76.36 KB) Outlook Email Sep 19, 2005
AMEC00282 RE Slope Inclinometer Survey (109.19 KB) Outlook Email Jan 17, 2012
AMEC00330 TSF Water Management Plan (156.95 KB) Outlook Email Jul 14, 2014
AMEC00043 Mount Polley Update (9.46 KB) Outlook Email Feb 24, 2006
AMEC00299 RE Hydrological Data (82.67 KB) Outlook Email Jan 02, 2013
AMEC00219 Proposed Construction Plan (3) (40.53 KB) Outlook Email Jun 05, 2014
AMEC00011 South dam -pre CBL and berm construction (9.58 KB) Outlook Email Jun 09, 2005
AMEC00059 ME Geotextile figure and test holes (9.18 KB) Outlook Email Mar 22, 2006
AMEC00315 RE Daily Report 2014-06-09, SI's 2014-06-08 (88.89 KB) Outlook Email Jun 10, 2014
AMEC00283 Mt.Polley Instrumentation Installation Package part 2 (67.71 KB) Outlook Email Jul 10, 2011
AMEC00075 Foundation Drain (38.17 KB) Outlook Email
AMEC00331 RE. Corner 5 possible realignment (114.34 KB) Outlook Email Jul 16, 2014
AMEC00044 Mount Polley Update (9.47 KB) Outlook Email Feb 24, 2006
AMEC00300 RE Hydrological Data (82.06 KB) Outlook Email Jan 02, 2013
AMEC00012 Geotextile and perforated piping - Main and South Embankments (19.82 KB) Outlook Email Jun 23, 2005
AMEC00060 ME Geotextile figure and test holes (2) (9.18 KB) Outlook Email Mar 22, 2006
AMEC00316 Document has been removed Outlook Email Jun 12, 2014
AMEC00028 FW Log Bridge (79.33 KB) Outlook Email Sep 27, 2005
AMEC00284 RE Slope Inclinometers Survey (131.58 KB) Outlook Email Jan 19, 2012
AMEC00076 Toe Drain (40.49 KB) Outlook Email
AMEC00045 Mount Polley Seepage Water conductivity (9.31 KB) Outlook Email Mar 02, 2005
AMEC00301 RE Field Investigation Summary (133.96 KB) Outlook Email Jun 06, 2013
AMEC00013 Correction to Geotextile and perforated piping -Main and South Embankments (19.98 KB) Outlook Email Jun 23, 2005
AMEC00061 Wight Pit road photos (9.2 KB) Outlook Email Mar 24, 2006
AMEC00285 RE Impoundment Stability (105.58 KB) Outlook Email Jun 05, 2012
AMEC00077 RE Basin Till Liner (73.9 KB) Outlook Email Jul 28, 2006
AMEC00334 RE TSF Water Management Plan (200.49 KB) Outlook Email Jul 16, 2014
AMEC00046 Mount Polley Seepage Water conductivity (2) (9.31 KB) Outlook Email Mar 02, 2005

Pages