KP00003 |
Report on Feasibility Design of Test Heap Leach Pad Rev 1 (1.1 MB) |
Report |
Sep 30, 2006 |
KP00004 |
Test Heap Leach Pad Construction Report (10.32 MB) |
Report |
Mar 12, 2007 |
KP00005 |
Mount Polley Project - Tailings Facility Summary (2.5 MB) |
Presentation |
Feb 03, 2005 |
KP00006 |
Mount Polley Project - Tailings Facility Summary (6.7 MB) |
Presentation |
Feb 03, 2005 |
KP00007 |
Wight Pit Dewatering (92.74 KB) |
Letter |
Feb 10, 2006 |
KP00008 |
Outstanding Invoice NO. 12351 (91.78 KB) |
Letter/invoice |
Mar 31, 2006 |
KP00009 |
Formal Dam Safety Review of Tailings Dam Proposal (267.9 KB) |
Proposal/letter |
Jul 26, 2006 |
KP00010 |
Fax Amendment to Permit From Ron Martel to Les Galbraith (300.13 KB) |
Permits |
Aug 15, 2006 |
KP00011 |
Report of Inspector of Mines Geotech (143.5 KB) |
Inspection Report |
Aug 30, 2006 |
KP00012 |
Site Visit Memo Nov1 (26.93 KB) |
Memo |
Nov 20, 2006 |
KP00013 |
Appendix A -Reference Documents (292.81 KB) |
Appendix |
Dec 01, 2006 |
KP00014 |
Dam Safety Review Mount Polley Mine, Likely British Columbia (22.31 MB) |
Report |
Dec 01, 2006 |
KP00015 |
Email from Ken Brower to Ron Martel Dam Safety Review (38.7 KB) |
Email |
Dec 18, 2006 |
KP00016 |
Scope of Work and Budget for TSF Stage 6 (877.36 KB) |
Proposal/letter |
Jan 29, 2007 |
KP00017 |
Upstream Toe Drain Seepage Estimations (567.02 KB) |
Letter |
Jun 02, 2007 |
KP00018 |
Tailings Facility Summary Presentation PDF (1.27 MB) |
Presentation |
Feb 26, 2007 |
KP00019 |
Tailings Facility Summary Presentation Power Point (15.61 MB) |
Presentation |
Feb 26, 2007 |
KP00020 |
Test Heap Leach Pad -Responses to Comments by MOEM (264.71 KB) |
Letter |
Feb 28, 2007 |
KP00021 |
Revised Scope of Work and Budget for TSF Stage 6 (174.83 KB) |
Letter |
Mar 05, 2007 |
KP00022 |
Hydrology Review for Hazeltine Creek, Station W7 (432.02 KB) |
Letter |
Jun 03, 2007 |
KP00023 |
Upstream Toe Drain Seepage Estimations (581.13 KB) |
Letter |
Mar 14, 2007 |
KP00024 |
Hydrology Review for Hazeltine Creek, Station W7 (412.74 KB) |
Letter |
Mar 14, 2007 |
KP00025 |
Chemical Analysis of Effluent (435.61 KB) |
Letter |
Mar 14, 2007 |
KP00026 |
Initial Effluent Plume Delineation Study for Hazeltine Creek (1.77 MB) |
Letter |
Mar 14, 2007 |
KP00027 |
2010 Flows in Hazeltine Creek (603.54 KB) |
Letter |
Feb 16, 2011 |
KP00028 |
From Ron Martel to Les Galbraith -Site Water Mgmt (98.92 KB) |
Letter |
Mar 03, 2011 |
KP00029 |
Document has been removed |
Table |
Mar 08, 2011 |
KP00030 |
2010 Engineering Support for Mount Polley Mine (1.51 MB) |
Letters & Summary Table |
Mar 15, 2011 |
KP00031 |
Mount Polley AutoCAD Drawings (8.96 MB) |
Autocad Drawings |
Mar 24, 2011 |
KP00032 |
2010 Engineering Support for Mount Polley Mine (437.56 KB) |
Letter Of Transmittal |
Mar 25, 2011 |
KP00033 |
VW Calibration Sheets (3.48 MB) |
Piezo Calibration Records |
|
KP00034 |
VW Instrument Installation Records (22.15 KB) |
Spreadsheet |
|
KP00035 |
VW Piezo Data (1.18 MB) |
Spreadsheet |
|
KP00036 |
2010 Engineering Support for Mount Polley Mine (431.68 KB) |
Letter Of Transmittal |
Mar 25, 2011 |
KP00037 |
Drain Flow Data (140.98 KB) |
Spreadsheet |
|
KP00038 |
Inclinometer Displacement Record (2.62 MB) |
Spreadsheet |
|
KP00039 |
Document has been removed |
Email |
Mar 25, 2011 |
KP00040 |
Communication Relating to Transfer of Records from KP to AMEC (91.69 KB) |
Summary Tables |
Oct 03, 2014 |
KP00041 |
Chief Inspect of Mines Order (536.1 KB) |
Letter |
Sep 24, 2014 |
KP00042 |
Response to MEM Order (748.58 KB) |
Letter |
Oct 10, 2014 |
MOE00001 |
Mount Polley Mine Technical Assessment Report for a Proposed Discharge of Mine Effluent (12.95 MB) |
Report |
Jul 01, 2009 |
MP00000 |
Mount Polley TSF Geotechnical Files - Panel Version (70.36 KB) |
Table |
Aug 25, 2014 |
MP00001 |
Imperial Metals Corp. Mt. Polley Project Tailings Storage Facility Design Report (Ref. No. 1625/1) Volume 1 (13.34 MB) |
Report |
May 26, 1995 |
MP00002 |
Imperial Metals Corp. Mt. Polley Project Tailings Storage Facility Design Report (Ref. No. 1625/1) Volume II - Appendices (19.71 MB) |
Report |
May 26, 1995 |
MP00003 |
Imperial Metals Corp. Mt. Polley Project Tailings Storage Facility Site Inpsection Manual (Ref. No. 1625/2) (2.31 MB) |
Report |
May 26, 1995 |
MP00004 |
Mount Polley Test pit logs and photos (32.35 MB) |
Report |
Oct 18, 1995 |
MP00005 |
Imperial Metals Corporation Mt. Polley Project, Respons to Review Comments on Tailings Embankment Design (Ref. No. 1625/6) (6.97 MB) |
Report |
Jan 25, 1996 |
MP00006 |
Mt. Polly Tailings Dam (6.71 MB) |
Inspection Report |
Oct 23, 1995 |
MP00007 |
Mount Polley Construction Drawings, various revisions (24.76 MB) |
Drawings |
Jun 02, 1995 |
MP00008 |
Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on On-going Construction Requirements (Ref.No.10162/9-3) (61.27 MB) |
Report |
Dec 02, 1997 |