Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 226 - 250 of 847
View: 25 | 50 | 100
Document ID Title Typesort ascending Published
AMEC00012 Geotextile and perforated piping - Main and South Embankments (19.82 KB) Outlook Email Jun 23, 2005
AMEC00076 Toe Drain (40.49 KB) Outlook Email
AMEC00195 Document has been removed Outlook Email Jun 04, 2013
AMEC00289 Back to design at corner 4 - Mt. Polley (74.95 KB) Outlook Email Jul 27, 2012
AMEC00055 RE PE DS toe drain design change (79.5 KB) Outlook Email Mar 21, 2006
AMEC00330 TSF Water Management Plan (156.95 KB) Outlook Email Jul 14, 2014
AMEC00206 RE 2013 Monthly Elevations - December (145.24 KB) Outlook Email Feb 20, 2014
AMEC00300 RE Hydrological Data (82.06 KB) Outlook Email Jan 02, 2013
AMEC00066 RE March 27 to April 2 Report -Stage 4 Construction (86.09 KB) Outlook Email Apr 04, 2006
AMEC00034 Tailings Work (84.49 KB) Outlook Email Dec 22, 2005
AMEC00279 Construction Testing (75.32 KB) Outlook Email Aug 09, 2011
AMEC00045 Mount Polley Seepage Water conductivity (9.31 KB) Outlook Email Mar 02, 2005
AMEC00013 Correction to Geotextile and perforated piping -Main and South Embankments (19.98 KB) Outlook Email Jun 23, 2005
AMEC00217 Proposed Construction Plan (67.55 KB) Outlook Email Jun 05, 2014
AMEC00185 RE MPMC 2013 CMM (269.74 KB) Outlook Email Apr 04, 2013
AMEC00077 RE Basin Till Liner (73.9 KB) Outlook Email Jul 28, 2006
AMEC00196 Document has been removed Outlook Email Jun 04, 2013
AMEC00322 Document has been removed Outlook Email Jun 27, 2014
AMEC00056 RE PE DS toe drain design change (2) (79.88 KB) Outlook Email Mar 21, 2006
AMEC00024 RE Mt Polley (19.69 KB) Outlook Email Sep 12, 2005
AMEC00331 RE. Corner 5 possible realignment (114.34 KB) Outlook Email Jul 16, 2014
AMEC00301 RE Field Investigation Summary (133.96 KB) Outlook Email Jun 06, 2013
AMEC00067 RE Drill rig booked for Monday May 8th (154.95 KB) Outlook Email Apr 07, 2006
AMEC00035 Mount Polley update (11.28 KB) Outlook Email Feb 14, 2006
AMEC00280 RE Construction Testing (112.54 KB) Outlook Email Aug 09, 2011

Pages