Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 201 - 225 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
AMEC00106 Capacity of the Existing Mine Tailings Pipeline (402.91 KB) Letter Jul 24, 2008
MP00065 Mt. Polley Tailings Dam (33 KB) Letter Jul 23, 1996
MP00128 Annual Dam Safety Inspection Report and Operations Manual (75.14 KB) Letter Apr 22, 2002
AMEC00211 Mount Polley Mine Assessment of Groundwater Monitoring Post TSF Expansion (75.79 KB) Letter Apr 08, 2014
AMEC00156 2012 Stage 8A (965.0 m) TSF Stability Analysis and Construction Drawings (22.77 KB) Letter Sep 01, 2012
MP00129 Annual Dam Safety Inspection Report and Operations Manual (45.4 KB) Letter May 07, 2002
KP00020 Test Heap Leach Pad -Responses to Comments by MOEM (264.71 KB) Letter Feb 28, 2007
AMEC00336 Document has been removed Letter Jul 18, 2014
MP00099 Application for License to Discharge Tailings (27.45 KB) Letter Jun 03, 1997
MP00145 Mount Polley Tailings Operating Manual 2006 (27.71 KB) Letter May 02, 2006
MP00130 Acknowledging receiving report Tailings Storage Facility, Report on 2002 Annual Inspection (37.57 KB) Letter Jun 26, 2003
KP00021 Revised Scope of Work and Budget for TSF Stage 6 (174.83 KB) Letter Mar 05, 2007
MP00069 Mt. Polley Tailings Dam (78.77 KB) Letter Jul 30, 1996
MP00241 Tailings Storage Facility, 2007 Annual Inspection (35.61 KB) Letter Apr 22, 2008
MP00115 Letter covering submission of 3 reports, Dec. 13, 16 and 23, 1999 (128.28 KB) Letter Feb 04, 2000
MP00209 Tailings Storage Facility - Stage 10 (2014 Construction) (134.87 KB) Letter Jul 28, 2014
MP00131 Mount Polley Mine - Application for Amendment to M-200 Mine Plan and Reclamation Program (36.24 KB) Letter Aug 03, 2004
KP00022 Hydrology Review for Hazeltine Creek, Station W7 (432.02 KB) Letter Jun 03, 2007
MP00179 Tailings Storage Facility, 2007 Annual Inspection (36.02 KB) Letter Apr 22, 2008
MP00053 Mt. Polley Project Surface Water Control (3.32 MB) Letter May 05, 1995
MP00225 Mount Polley Stage 6 TSF design (1.02 MB) Letter Dec 19, 2007
AMEC00029 RE Slope Stability Analysis (391.2 KB) Letter Oct 13, 2005
MP00242 Untitled (31.23 KB) Letter Mar 16, 2010
KP00007 Wight Pit Dewatering (92.74 KB) Letter Feb 10, 2006
MP00086 Mount Polley Tailings Facility Surface Water Control During Construction (65.47 KB) Letter Oct 02, 1996

Pages