Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 751 - 775 of 847
View: 25 | 50 | 100
Document IDsort ascending Title Type Published
AMEC00097 Efficiency of Tailings Construction Operations (2) (196.04 KB) Report Jun 10, 2008
AMEC00096 Efficiency of Tailings Construction Operations (193.48 KB) Report Jun 10, 2008
AMEC00095 Efficiency of Tailings Sand Cat Operations (43.14 KB) Summary Sheet Jun 04, 2008
AMEC00094 Efficiency of Tailings Sand Operations (71.02 KB) Report
AMEC00093 Report on Stage 4 Construction (903.04 KB) Report Mar 13, 2007
AMEC00092 DRAFT Mt Polley TSF Optimization Potential (4) (255.77 KB) Report Feb 26, 2007
AMEC00091 DRAFT Mt Polley TSF Optimization Potential (3) (127.54 KB) Report Feb 26, 2007
AMEC00090 DRAFT Mt Polley TSF Optimization Potential (2) (168.81 KB) Report Feb 23, 2007
AMEC00089 DRAFT Mt Polley TSF Optimization Potential (235.4 KB) Report Feb 01, 2007
AMEC00088 Mount Polley South Embankment Sand (1.41 MB) Memo Jun 14, 2005
AMEC00087 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (6) (1.7 MB) Report Nov 01, 2006
AMEC00086 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (5) (1.68 MB) Report Nov 01, 2006
AMEC00085 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (4) (1.67 MB) Report Nov 01, 2006
AMEC00084 November 1 Site Visit by Les Galbraith (36.23 KB) Memo Nov 20, 2006
AMEC00083 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (3) (1.79 MB) Report Nov 01, 2006
AMEC00082 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (2) (1.06 MB) Report Nov 01, 2006
AMEC00081 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (623.9 KB) Report Nov 01, 2006
AMEC00080 OMS Manual (325.39 KB) Report Oct 06, 2006
AMEC00079 Preliminary Design of the TSF to its Ultimate Elevation (274.89 KB) Report Mar 08, 2005
AMEC00078 Geotechnical Review, Drainage Aspects, Main Embankment Dam, TSF (19.49 MB) Report
AMEC00077 RE Basin Till Liner (73.9 KB) Outlook Email Jul 28, 2006
AMEC00076 Toe Drain (40.49 KB) Outlook Email
AMEC00075 Foundation Drain (38.17 KB) Outlook Email
AMEC00074 Mt Polley Mine - Review of Tailings (119.84 KB) Memo Nov 25, 2005
AMEC00073 TSF Report on 2005 Annual Inspection (2) (274.57 KB) Report May 03, 2006

Pages