Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 51 - 75 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
AMEC00051 Re: Zone U Samples cont. (2) (87.4 KB) Outlook Email Mar 10, 2006
AMEC00052 RE Depth of Inclinometers (80.12 KB) Outlook Email Mar 17, 2006
AMEC00053 PE DS toe drain design change (8.75 KB) Outlook Email Mar 21, 2006
AMEC00054 PE DS toe drain design change (2) (9.14 KB) Outlook Email Mar 21, 2006
AMEC00055 RE PE DS toe drain design change (79.5 KB) Outlook Email Mar 21, 2006
AMEC00056 RE PE DS toe drain design change (2) (79.88 KB) Outlook Email Mar 21, 2006
AMEC00057 RE PE DS toe drain design change cont (146.27 KB) Outlook Email Mar 22, 2006
AMEC00058 RE PE DS toe drain design change cont (2) (146.28 KB) Outlook Email Mar 22, 2006
AMEC00059 ME Geotextile figure and test holes (9.18 KB) Outlook Email Mar 22, 2006
AMEC00060 ME Geotextile figure and test holes (2) (9.18 KB) Outlook Email Mar 22, 2006
AMEC00061 Wight Pit road photos (9.2 KB) Outlook Email Mar 24, 2006
AMEC00062 Wight Pit road photos (2) (9.21 KB) Outlook Email Mar 24, 2006
AMEC00063 Zone C Tracking (13.27 KB) Outlook Email Mar 28, 2006
AMEC00064 Zone C Tracking cont (12.37 KB) Outlook Email Mar 29, 2006
AMEC00065 Inclinometer installation guide (12.93 KB) Outlook Email Mar 29, 2006
AMEC00066 RE March 27 to April 2 Report -Stage 4 Construction (86.09 KB) Outlook Email Apr 04, 2006
AMEC00067 RE Drill rig booked for Monday May 8th (154.95 KB) Outlook Email Apr 07, 2006
AMEC00068 Zone F (12.86 KB) Outlook Email Apr 07, 2006
AMEC00069 RE: Time Sheets (77.3 KB) Outlook Email Apr 13, 2006
AMEC00070 RE Draft Weekly Apr 3 to Apr 9 - Mt Polley (76.9 KB) Outlook Email Apr 18, 2006
AMEC00071 Pizometers (12.65 KB) Outlook Email Apr 19, 2006
AMEC00072 TSF Report on 2005 Annual Inspection (542.35 KB) Report May 03, 2006
AMEC00073 TSF Report on 2005 Annual Inspection (2) (274.57 KB) Report May 03, 2006
AMEC00074 Mt Polley Mine - Review of Tailings (119.84 KB) Memo Nov 25, 2005
AMEC00075 Foundation Drain (38.17 KB) Outlook Email

Pages