Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 451 - 475 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
AMEC00179 TSF Stage 8/8A 2012 As-Built Report (4) (1.72 MB) Report Mar 30, 2013
MP00043 Document has been removed Report Apr 08, 2013
AMEC00099 Efficiency of Tailings Construction Operations (4) (931.36 KB) Report Jun 10, 2008
MPMC00019 Mount Polley Mining Corporation, Mount Polley Mine, Report on Stage 3 Construction (Ref.No. 1162/14-3) (7.21 MB) Report Oct 19, 2001
AMEC00148 TSF- 2012 Stage 8 Expansion - Stability Analyses (569.5 KB) Report Feb 14, 2012
MP00012 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility,Report on 1998 Construction and Annual Inspection (Ref.No. 11162/10-1) (68.77 MB) Report Jun 16, 1999
AMEC00116 2011 Stage 7 Expansion Stability Analyses TSF (212.26 KB) Report
MPMC00036 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on 2010 Annual Inspection (Ref. No. VA101-1/29-2) (6 MB) Report Jan 25, 2011
AMEC00164 TSF 2012 Construction As-Built Report (944.29 KB) Report Jan 31, 2013
MPMC00004 Imperial Metals Corporation Mt. Polley Project, Respons to Review Comments on Tailings Embankment Design (Ref. No. 1625/6) (6.11 MB) Report Jan 25, 1996
AMEC00212 Pages from 2013 Annual Environmental and Reclamation Report (546.29 KB) Report
MPMC00132 Annual Environmental and Reclamation Report 2006 (3.65 MB) Report Mar 01, 2007
AMEC00340 RE Mount Polley Mine TSF Expansion (1.25 MB) Report Jul 28, 2014
MP00076 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2005 Annual Inspection (Ref.No. Va101-01/11-1) (82.81 MB) Report May 03, 2006
AMEC00004 Geotechnical Review, Drainage Aspects Main Embankment Dam Tailings Storage Facility Mt. Polley Project, BC (8.86 MB) Report Mar 01, 1997
AMEC00132 2012 Construction Monitoring Manual (449.75 KB) Report Feb 14, 2012
AMEC00180 TSF Stage 8/8A 2012 As-Built Report (5) (1.72 MB) Report Mar 30, 2013
MP00044 Mount Polley Mine Tailings Storage Facility Stage 9, 2013 As-Built and Annual Review Report (40.75 MB) Report Mar 12, 2014
AMEC00100 Efficiency of Tailings Construction Operations (5) (180 KB) Report Jun 10, 2008
MPMC00020 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2002 Annual Inspection (Ref.No. Va101-00001/3-1) (25.36 MB) Report Apr 30, 2003
MPMC00021 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2004 Annual Inspection (Ref.No. Va101-00001/7-1) (19.14 MB) Report Feb 08, 2005
AMEC00149 TSF- 2012 Stage 8 Expansion - Stability Analyses (2) (753.4 KB) Report Feb 14, 2012
MP00013 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility,Evaluation of Cycloned Tailings for Embankment Construction (Ref. No. 11162/11-1) (34.51 MB) Report Jun 16, 1999
AMEC00117 TSF Report on Stage 6B Construction (11.85 MB) Report Jan 25, 2011
MPMC00037 Mount Polley Mines, Tailing Storage Facility Stage 7, 2011 Construction Monitoring Manual (10.55 MB) Report Apr 20, 2011

Pages