Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 426 - 450 of 847
View: 25 | 50 | 100
Document ID Title Typesort ascending Published
AMEC00212 Pages from 2013 Annual Environmental and Reclamation Report (546.29 KB) Report
MPMC00132 Annual Environmental and Reclamation Report 2006 (3.65 MB) Report Mar 01, 2007
AMEC00340 RE Mount Polley Mine TSF Expansion (1.25 MB) Report Jul 28, 2014
MP00076 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2005 Annual Inspection (Ref.No. Va101-01/11-1) (82.81 MB) Report May 03, 2006
AMEC00004 Geotechnical Review, Drainage Aspects Main Embankment Dam Tailings Storage Facility Mt. Polley Project, BC (8.86 MB) Report Mar 01, 1997
AMEC00132 2012 Construction Monitoring Manual (449.75 KB) Report Feb 14, 2012
AMEC00180 TSF Stage 8/8A 2012 As-Built Report (5) (1.72 MB) Report Mar 30, 2013
AMEC00181 TSF Stage 8/8A 2012 As-Built Report (6) (1.71 MB) Report Mar 27, 2013
MP00045 Mount Polley Mine Tailings Storage Facility Stage 9, 2013 Construction Monitoring Manual (11.39 MB) Report Apr 11, 2013
AMEC00101 Efficiency of Tailings Construction Operations (6) (195.19 KB) Report Jun 10, 2008
MPMC00021 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2004 Annual Inspection (Ref.No. Va101-00001/7-1) (19.14 MB) Report Feb 08, 2005
AMEC00149 TSF- 2012 Stage 8 Expansion - Stability Analyses (2) (753.4 KB) Report Feb 14, 2012
MP00013 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility,Evaluation of Cycloned Tailings for Embankment Construction (Ref. No. 11162/11-1) (34.51 MB) Report Jun 16, 1999
AMEC00117 TSF Report on Stage 6B Construction (11.85 MB) Report Jan 25, 2011
MPMC00037 Mount Polley Mines, Tailing Storage Facility Stage 7, 2011 Construction Monitoring Manual (10.55 MB) Report Apr 20, 2011
AMEC00165 Hydrogeology Assessment and Data Review (2) (319.91 KB) Report
AMEC00085 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (4) (1.67 MB) Report Nov 01, 2006
MPMC00005 1997 Geotechnical Review Darinage Aspects Main Embankment Dam (MAJM) (8.26 MB) Report Mar 01, 1997
MPMC00133 Annual Environmental and Reclamation Report 2007 (235.19 KB) Report Mar 01, 2008
MP00077 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2007 Annual Inspection (Ref.No. Va101-01/11-1) (83.99 MB) Report Dec 19, 2007
AMEC00005 Mount Polley Mine 2004 Feasibility Study (18.78 MB) Report Aug 01, 2004
AMEC00133 2011 Construction As-Built Report and Annual Review (2.03 MB) Report Apr 06, 2012
MP10009 1997 TSF Updated Design Reprot (KP) (10.7 MB) Report Jun 06, 1997
AMEC00182 Stage 9 TSF Construction Drawings and Stability Analyses for Embankment Raise to El. 970 m (2) (49.33 KB) Report Mar 26, 2013
MPMC00102 Report on Project Water Management (4.92 MB) Report Feb 06, 1995

Pages