Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 351 - 375 of 847
View: 25 | 50 | 100
Document ID Title Typesort ascending Published
AMEC00113 TSF Design Report Volume 1 (7.07 MB) Report May 26, 1995
AMEC00124 DRAFT 2011 Construction Monitoring Manual (3) (702.22 KB) Report Apr 15, 2011
BGC00001 TSF 2012 Annual Review (6 MB) Report Apr 08, 2013
AMEC00092 DRAFT Mt Polley TSF Optimization Potential (4) (255.77 KB) Report Feb 26, 2007
MP00076 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2005 Annual Inspection (Ref.No. Va101-01/11-1) (82.81 MB) Report May 03, 2006
MPMC00026 Final Report Dam Saftey Review (2.51 MB) Report Dec 01, 2006
MP00044 Mount Polley Mine Tailings Storage Facility Stage 9, 2013 As-Built and Annual Review Report (40.75 MB) Report Mar 12, 2014
MP00014 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on Cycloned Sand Construction of Stage 3 and On-Going Stages of the Tailings Storage Facility (Ref.No. 11162/12-2) Volume I of II (49.55 MB) Report Dec 13, 1999
MPMC00005 1997 Geotechnical Review Darinage Aspects Main Embankment Dam (MAJM) (8.26 MB) Report Mar 01, 1997
MPMC00131 Annual Environmental and Reclamation Report 2005 (213.97 KB) Report Mar 01, 2006
AMEC00165 Hydrogeology Assessment and Data Review (2) (319.91 KB) Report
MP00023 Mount Polley Mining Corporation Mount Polley Mine, Tailings Cyclone Sands Geochemical Evaluation (39.56 MB) Report Dec 02, 1998
MP10011 1996 KP Geotech Investigations (8.16 MB) Report Jul 05, 1996
AMEC00135 2011 Construction As-Built Report and Annual Review (2) (1.72 MB) Report Apr 06, 2012
AMEC00103 TSF OMS (5.83 MB) Report Mar 30, 2010
MPMC00037 Mount Polley Mines, Tailing Storage Facility Stage 7, 2011 Construction Monitoring Manual (10.55 MB) Report Apr 20, 2011
AMEC00323 Document has been removed Report Jun 27, 2014
MPMC00016 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility Report on 1999 Construction (Ref. No. 11162/13-5) (7.68 MB) Report Aug 30, 2000
AMEC00176 Hydrogeology Assessment and Data Review with appendices (7.4 MB) Report Mar 01, 2013
MP00034 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 6A Construction (Ref.No. Va101-1/23-1) (118.13 MB) Report Jul 10, 2009
MP00004 Mount Polley Test pit logs and photos (32.35 MB) Report Oct 18, 1995
AMEC00146 2011 Construction As-Built Report and Annual Review DRAFT (5) (3.11 MB) Report Mar 21, 2012
AMEC00114 TSF Design Report Volume 2 (10.65 MB) Report May 26, 1995
MP00015 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on Cycloned Sand Construction of Stage 3 and On-Going Stages of the Tailings Storage Facility (Ref.No. 11162/12-2) Volume II of II (74.96 MB) Report Dec 13, 1999
AMEC00157 TSF 2012 Stage 8a (965m) Expansion Stability Analyses (570.64 KB) Report

Pages