Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 276 - 300 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
MP00215 Select Mines Act permits for TSF geotechnical design, construction, operation. (4.88 MB) Permits Aug 09, 2013
KP00010 Fax Amendment to Permit From Ron Martel to Les Galbraith (300.13 KB) Permits Aug 15, 2006
MP00213 Table of all Mines Act permits and permit amendments (20.57 KB) Permits Aug 05, 2014
BGC00006 Document has been removed Presentation Jun 02, 2014
KP00018 Tailings Facility Summary Presentation PDF (1.27 MB) Presentation Feb 26, 2007
KP00019 Tailings Facility Summary Presentation Power Point (15.61 MB) Presentation Feb 26, 2007
MP00050 Mount Polley Project Tailings Storage Facility (49.41 MB) Presentation Feb 03, 2005
KP00005 Mount Polley Project - Tailings Facility Summary (2.5 MB) Presentation Feb 03, 2005
KP00006 Mount Polley Project - Tailings Facility Summary (6.7 MB) Presentation Feb 03, 2005
MP00212 Mount Polley Mine: Short Term Water Treatment/TSF Design, Joint MEM/MOE Presentation (7.77 MB) Presentation Jun 02, 2014
KP00016 Scope of Work and Budget for TSF Stage 6 (877.36 KB) Proposal/letter Jan 29, 2007
KP00009 Formal Dam Safety Review of Tailings Dam Proposal (267.9 KB) Proposal/letter Jul 26, 2006
AMEC00171 Hydrogeology Assessment and Data Review (3) (370.34 KB) Report
AMEC00101 Efficiency of Tailings Construction Operations (6) (195.19 KB) Report Jun 10, 2008
MPMC00173 2013 Environmental and Reclamation Report (919.46 KB) Report Mar 01, 2014
MP00026 Mount Polley Mining Corporation Mount Polley Mine, Design of the Tailings Storage Facility to Ultimate Elevation (Ref. No. VA101-001-08-1 (91.7 MB) Report Mar 14, 2005
MPMC00034 Mount Polley Mining Corporation Mount Polley Mine, Tailings Storage Facility Report on 2009 Annual Inspection (7.19 MB) Report Dec 18, 2009
AMEC00149 TSF- 2012 Stage 8 Expansion - Stability Analyses (2) (753.4 KB) Report Feb 14, 2012
MP00074 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2004 Annual Inspection (Ref.No. Va101-00001/7-1) (78.01 MB) Report Feb 08, 2005
MPMC00128 Annual Environmental & Reclamation Report 2002 (205.38 KB) Report Jan 01, 2002
AMEC00187 TSF -Stage 9 2013 Construction Monitoring Manual (2) (959.96 KB) Report Apr 11, 2013
MPMC00002 Imperial Metals Corp. Mt. Polley Project Tailings Storage Facility Design Report (Ref. No. 1625/1) (17.28 MB) Report May 26, 1995
AMEC00117 TSF Report on Stage 6B Construction (11.85 MB) Report Jan 25, 2011
MP00042 2012 Stage 8A Tailings Storage Facility Construction Drawings and Stability Analyses for Embankment Raise El. 965m (7.15 MB) Report Sep 10, 2012
MP00016 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Operation, Maintenance and Surveillance Manual for Stage 1A Embankment (El. 927m) (Ref No. 1627/1) (7.6 MB) Report Mar 11, 1997

Pages