Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 726 - 750 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
MPMC00111 TSF Stage 10 Crest Elevation Design Criteria (47.87 KB) Memo Jun 09, 2014
BGC00002 Document has been removed Memo Jun 18, 2013
BGC00003 Document has been removed Memo Jul 25, 2013
MP00067 Geotechncial Information Obtained from 1996 Borehole Investigation (2.02 MB) Memo Jul 26, 1996
KP00012 Site Visit Memo Nov1 (26.93 KB) Memo Nov 20, 2006
AMEC00088 Mount Polley South Embankment Sand (1.41 MB) Memo Jun 14, 2005
BGC00004 Document has been removed Memo Oct 22, 2013
MP00068 Borehole Logs for PRW 96-1 to 4 (317.96 KB) Memo Jul 30, 1996
AMEC00016 Mount Polley PAG waste rock storage (39.98 KB) Memo Jul 04, 2005
AMEC00220 Document has been removed Memo
AMEC00154 Predictions of Pit Lake Formation For the Springer Open Pit (15.63 MB) Memo Aug 19, 2010
BGC00005 Document has been removed Memo Nov 27, 2013
AMEC00017 Mount Polley South Embankment Sand (1.41 MB) Memo Jun 14, 2005
AMEC00221 Document has been removed Memo
AMEC00222 Document has been removed Memo Jun 12, 2014
AMEC00158 2012 Stage 8A TSF Construction Drawings and Stability Analyses for Raise to El. 965m -Signed (29.71 KB) Memo Sep 10, 2012
MPMC00105 Document has been removed Memo Jun 18, 2013
MP00059 Mt. Polley Site Inspection (2.9 MB) Memo Oct 02, 1995
AMEC00160 2012 Stage 8A TSF Construction Drawings and Stability Analyses for Embankment Raise to El. 965m (36.15 KB) Memo Sep 10, 2012
AMEC00169 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed, edits (3.08 MB) Memo With Appendices Mar 08, 2013
AMEC00170 Stage 9 TSF Construction Drawings and Stability Analyses for Raise to El. 970m -signed, appendices (16.13 MB) Memo With Appendices Mar 08, 2013
AMEC00256 TSF - Stage 8 2012 Construction Monitoring Manual (1.67 MB) Binder- Report Mar 30, 2012
AMEC00246 Dam Safety Review Mount Polley Mine, Likely British Columbia (4.45 MB) Binder- Report Dec 01, 2006
AMEC00252 Efficiency of Tailings Constructions Operations (3.22 MB) Binder- Report Dec 01, 2006
AMEC00247 Index Vol 1 of 2 (48.62 KB) Binder- Index Vol 1 Of 2

Pages