Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 526 - 550 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
AMEC00189 TSF -Stage 9 2013 Construction Monitoring Manual with appendices (42.11 MB) Report Apr 11, 2013
MPMC00109 Mount Polley Water and Load Balance (2.36 MB) Report Dec 01, 2011
AMEC00317 Document has been removed Report Jun 13, 2014
AMEC00109 TSF Report on 2010 Annual Inspection (7.51 MB) Report Jan 25, 2011
MPMC00029 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Stage 6 Design of the Tailings Storage Facility (8.49 MB) Report Jun 18, 2007
MP00229 Mine Permit Amendment Application (91.93 MB) Report Nov 01, 2010
AMEC00157 TSF 2012 Stage 8a (965m) Expansion Stability Analyses (570.64 KB) Report
MP00021 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Addendum to Report on Cycloned Sand Construction of Stage 3 and On-Going Stage of the Tailings Storage Facility (Ref. No. 11162/13-4) (27.69 MB) Report May 11, 2000
MP10033 Mount Polley Mining Corporation Mount Polley Mine, Report on 1999 Annual Inspection (Ref. No. 11162/13-9) (9.49 MB) Report Oct 16, 2000
AMEC00205 TSF Stage 9 2013 As-Built Report -Draft for Client Comment (3.7 MB) Report Feb 01, 2014
AMEC00125 2011 Stage 7 Expansion Stability Analyses TSF with appendices (496.33 KB) Report
MPMC00045 Document has been removed Report Jul 25, 2014
MPMC00173 2013 Environmental and Reclamation Report (919.46 KB) Report Mar 01, 2014
AMEC00173 TSF Stage 8/8A 2012 As-Built Report (1.71 MB) Report Mar 15, 2013
MP00037 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on 2010Annual Inspection (Ref. No. VA101-1/24-1) (6 MB) Report Jan 25, 2011
AMEC00093 Report on Stage 4 Construction (903.04 KB) Report Mar 13, 2007
MPMC00013 Mount Polley Mining Corporation Mount Polley Mine, Report on Cycloned Sand Construction of Stage 3 and On-Going Stages of the Tailings Storage Facility (Ref.No. 11162/12-2) (106.04 MB) Report Nov 16, 1999
AMEC00094 Efficiency of Tailings Sand Operations (71.02 KB) Report
MPMC00014 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on Cycloned Sand Construction of Stage 3 and On-Going Stages of the Tailings Storage Facility (Ref.No. 11162/12-2) Volume II of II (75.34 MB) Report Dec 13, 1999
KP00002 Report on Feasibility Design of Test Heap Leach Pad Rev 0 (1.09 MB) Report Sep 15, 2006
AMEC00142 TSF-Stage 8 2012 Construction Monitoring Manual (3.84 MB) Report Mar 16, 2012
AMEC00190 TSF -Stage 9 2013 Construction Monitoring Manual with appendices (2) (42.1 MB) Report Apr 11, 2013
AMEC00110 Stage 6 Design Report for the Tailings Storage Facility - Mount Polley Mine (14.28 MB) Report Jun 18, 2007
MPMC00030 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2007 Annual Inspection (Ref.No. Va101-01/20-1) (20.55 MB) Report Dec 19, 2007
MP00022 Final Progress Report, No. 1 to 19, 2000 and 2001 (33.64 MB) Report Sep 01, 2000

Pages