Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 401 - 425 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
AMEC00189 TSF -Stage 9 2013 Construction Monitoring Manual with appendices (42.11 MB) Report Apr 11, 2013
AMEC00115 2011 Stage 7 Expansion Stability Analyses TSF Draft with Comments (258.83 KB) Report
MPMC00029 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Stage 6 Design of the Tailings Storage Facility (8.49 MB) Report Jun 18, 2007
AMEC00083 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (3) (1.79 MB) Report Nov 01, 2006
MP00027 Mount Polley Mining Corporation Mount Polley Mine, Stage 5 Design of the Tailings Storage Facility (Ref. No. VA101-01/12-1) (18.46 MB) Report Jun 12, 2006
MP10033 Mount Polley Mining Corporation Mount Polley Mine, Report on 1999 Annual Inspection (Ref. No. 11162/13-9) (9.49 MB) Report Oct 16, 2000
MP10003 1990 Feasibility Study - Geotechnical and Tailings Disposal (4.43 MB) Report Jun 01, 1990
AMEC00147 2011 Construction As-Built Report and Annual Review DRAFT (6) (1.62 MB) Report Mar 20, 2012
MP00008 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on On-going Construction Requirements (Ref.No.10162/9-3) (61.27 MB) Report Dec 02, 1997
AMEC00126 RE Tailings Storage Facility -Stage A (2011 Construction) (479.07 KB) Report Apr 20, 2011
MPMC00040 2012 Stage 8A Tailings Storage Facility Construction Drawings and Stability Analyses for Embankment Raise El. 965m (7.15 MB) Report Sep 10, 2012
AMEC00094 Efficiency of Tailings Sand Operations (71.02 KB) Report
MP00038 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 3C Construction (Ref.No. VA101-1/5-2) (78.92 MB) Report Sep 23, 2005
MPMC00008 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on Stage Ia/Ib Construction (Ref.No. 10162/7-5) (8.08 MB) Report Aug 14, 1997
MPMC00134 Annual Environmental & Reclamation Report 2008 (311.27 KB) Report Mar 01, 2009
AMEC00082 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (2) (1.06 MB) Report Nov 01, 2006
MPMC00102 Report on Project Water Management (4.92 MB) Report Feb 06, 1995
AMEC00137 2011 Construction As-Built Report and Annual Review DRAFT (2.58 MB) Report Mar 15, 2012
AMEC00179 TSF Stage 8/8A 2012 As-Built Report (4) (1.72 MB) Report Mar 30, 2013
AMEC00105 TSF Report on 2009 Annual Inspection (18.21 MB) Report Jan 05, 2010
MPMC00019 Mount Polley Mining Corporation, Mount Polley Mine, Report on Stage 3 Construction (Ref.No. 1162/14-3) (7.21 MB) Report Oct 19, 2001
AMEC00190 TSF -Stage 9 2013 Construction Monitoring Manual with appendices (2) (42.1 MB) Report Apr 11, 2013
AMEC00116 2011 Stage 7 Expansion Stability Analyses TSF (212.26 KB) Report
MPMC00030 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2007 Annual Inspection (Ref.No. Va101-01/20-1) (20.55 MB) Report Dec 19, 2007
MP10034 Mount Polley Mining Corporation Mount Polley Mine, Tailings Storage Facility Report on 2009 Annual Inspection (7.18 MB) Report Dec 18, 2009

Pages