Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 376 - 400 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
MPMC00128 Annual Environmental & Reclamation Report 2002 (205.38 KB) Report Jan 01, 2002
MP00030 Mount Polley Mining Coprproation Mount Polley Mine Tailings Storage Facility, Operation, Maintenance and Surveillance Manual (17.84 MB) Report Aug 28, 2006
MP00014 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on Cycloned Sand Construction of Stage 3 and On-Going Stages of the Tailings Storage Facility (Ref.No. 11162/12-2) Volume I of II (49.55 MB) Report Dec 13, 1999
AMEC00148 TSF- 2012 Stage 8 Expansion - Stability Analyses (569.5 KB) Report Feb 14, 2012
AMEC00166 TSF 2012 Construction As-Built Report (2) (939.66 KB) Report Jan 31, 2013
BGC00001 TSF 2012 Annual Review (6 MB) Report Apr 08, 2013
AMEC00159 TSF 2012 Stage 8a (965m) Expansion Stability Analyses (676.14 KB) Report Sep 10, 2012
AMEC00177 TSF Stage 8/8A 2012 As-Built Report (2) (1.72 MB) Report Mar 30, 2013
MP00073 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility Report on 2002 Annual Inspection (Ref.No. Va101-00001/3-1) (63.4 MB) Report Apr 30, 2003
AMEC00127 TSF OMS (2) (325.46 KB) Report Oct 06, 2006
MPMC00035 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 6B Construction (Ref.No. Va101-1/29-1) (9.79 MB) Report Jan 25, 2011
MP00041 Mount Polley Mines, Tailing Storage Facility, 2011 Construction As-Built and Annual Review (7.29 MB) Report Mar 30, 2012
MP10011 1996 KP Geotech Investigations (8.16 MB) Report Jul 05, 1996
AMEC00209 TSF Stage 9 2013 As-Built and Annual Review Report (2) (3 MB) Report Feb 01, 2014
MPMC00014 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility, Report on Cycloned Sand Construction of Stage 3 and On-Going Stages of the Tailings Storage Facility (Ref.No. 11162/12-2) Volume II of II (75.34 MB) Report Dec 13, 1999
MP00020 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facilityand Ancillary Features May 1, 1997 Site Inspection (Ref.No. 1627/4) (59.86 MB) Report Jun 03, 1997
MP00004 Mount Polley Test pit logs and photos (32.35 MB) Report Oct 18, 1995
AMEC00188 TSF -Stage 9 2013 Construction Monitoring Manual (3) (935.26 KB) Report Apr 05, 2013
AMEC00138 2011 Construction As-Built Report and Annual Review DRAFT (2) (2.51 MB) Report Mar 15, 2012
MP00104 Dam Safety Review Mount Polley Mine, Likely British Columbia (52.17 MB) Report Dec 06, 2014
MPMC00057 1996 GS Monitoring Installation (KP) (3.34 MB) Report Feb 07, 1997
AMEC00117 TSF Report on Stage 6B Construction (11.85 MB) Report Jan 25, 2011
MPMC00025 Mount Polley Mining Corporation Mount Polley Mine, Stage 5 Design of the Tailings Storage Facility (Ref. No. VA101-01/12-1) (7.31 MB) Report Jun 12, 2006
MPMC00129 Annual Environmental and Reclamation Report 2003 (141.76 KB) Report Jun 01, 2004
MP00031 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Report on Stage 4 Construction (Ref.No. Va101-1/10-1) (91.67 MB) Report Mar 13, 2007

Pages