Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 326 - 350 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
MPMC00042 Mount Polley Mining Coporation, Mount Polley Mine, Tailings Storage Facility 2012 Annual Review (6.02 MB) Report Apr 08, 2013
MP00207 Mount Polley Mine Tailings Storage Facility Operation, Maintenance and Surveillance Manual (5.19 MB) Report Mar 30, 2010
AMEC00086 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (5) (1.68 MB) Report Nov 01, 2006
AMEC00081 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (623.9 KB) Report Nov 01, 2006
MPMC00010 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility,1998 Annual Insepction Report (16.03 MB) Report Jun 26, 1998
MP10011 1996 KP Geotech Investigations (8.16 MB) Report Jul 05, 1996
AMEC00134 2011 Environmental and Reclaimation Report (2.96 MB) Report Mar 01, 2012
AMEC00001 Document has been removed Report Jul 05, 1996
MP00032 Mount Polley Mining Corporation Mount Polley Mine Tailings Storage Facility, Stage 6 Design of the Tailings Storage Facility (32.66 MB) Report Jun 18, 2007
KP00003 Report on Feasibility Design of Test Heap Leach Pad Rev 1 (1.1 MB) Report Sep 30, 2006
MPMC00026 Final Report Dam Saftey Review (2.51 MB) Report Dec 01, 2006
AMEC00150 TSF 2011 Construction As-Built Report and Annual Review (3) (23.94 MB) Report Mar 30, 2012
MP00080 Mount Polley Mining Corporation, Mount Polley Mine, Tailings Storage Facility, Operation, Maintenance and Surveillance Manual for Stage 3 (El. 944) Embankment (Ref.No. 1162/13-3 (23.73 MB) Report Aug 17, 2000
AMEC00295 Grain Size Distribution (131.53 KB) Report Aug 24, 2012
MPMC00137 2011 Environmental and Reclamation Report (1.69 MB) Report Mar 01, 2012
AMEC00118 2011 Construction Monitoring Manual (610.92 KB) Report Apr 15, 2011
MPMC00043 Mount Polley Mine Tailings Storage Facility Stage 9, 2013 Construction Monitoring Manual (11.39 MB) Report Apr 11, 2013
MP00208 Document has been removed Report Jul 25, 2014
AMEC00087 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (6) (1.7 MB) Report Nov 01, 2006
AMEC00082 DRAFT Dam Safety Review Mount Polley Mine, Likely British Columbia (2) (1.06 MB) Report Nov 01, 2006
MPMC00011 Mount Polley Mining Corporation Mount Polley Project Tailings Storage Facility,Report on 1998 Construction and Annual Inspection (Ref.No. 11162/10-1) (19.05 MB) Report Jun 16, 1999
MP10012 2011 TSF Site Investigation Report (AMEC) (82.61 MB) Report Mar 28, 2012
AMEC00135 2011 Construction As-Built Report and Annual Review (2) (1.72 MB) Report Apr 06, 2012
AMEC00002 Report on Geotechnical Investigations and Design of Open Pits (2) (765.07 KB) Report Jul 05, 1996
AMEC00202 TSF Stage 9 2013 As-Built Report (1.92 MB) Report Jan 01, 2014

Pages