Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 251 - 275 of 847
View: 25 | 50 | 100
Document ID Title Typesort descending Published
MPMC00103 Mount Polley Water Balance (3.55 MB) Letter Jul 30, 2004
MP00241 Tailings Storage Facility, 2007 Annual Inspection (35.61 KB) Letter Apr 22, 2008
MP00115 Letter covering submission of 3 reports, Dec. 13, 16 and 23, 1999 (128.28 KB) Letter Feb 04, 2000
MP00095 Mt. Polley Project - Operation, Maintenance and Surveillance Manual for Stage 1a, El. 927 m (43.82 KB) Letter Mar 12, 1997
MP00209 Tailings Storage Facility - Stage 10 (2014 Construction) (134.87 KB) Letter Jul 28, 2014
MP00131 Mount Polley Mine - Application for Amendment to M-200 Mine Plan and Reclamation Program (36.24 KB) Letter Aug 03, 2004
MP00179 Tailings Storage Facility, 2007 Annual Inspection (36.02 KB) Letter Apr 22, 2008
MP00225 Mount Polley Stage 6 TSF design (1.02 MB) Letter Dec 19, 2007
MP00100 South East Sediment Pond (52.66 KB) Letter And Diagram Jul 21, 1997
MP00139 Mount Polley Mine Tailings Storage Facility - Design of the Tailings Storage Facility to Ultimate Evaluation (256.69 KB) Letter And Diagram Apr 14, 2005
MP00118 Mt. Polley Tailings Storage Facility - Application to Construct to Elevation 944 Metres Amendment to Permit M-200 (1.29 MB) Letter And Diagrams May 25, 2000
MP00114 Mt. Polley Tailings Storage Facility - Interim Approval to Construction Stage 2C to Elev. 941 m. (300.06 KB) Letter And Diagrams Dec 22, 1999
KP00036 2010 Engineering Support for Mount Polley Mine (431.68 KB) Letter Of Transmittal Mar 25, 2011
KP00032 2010 Engineering Support for Mount Polley Mine (437.56 KB) Letter Of Transmittal Mar 25, 2011
MP10031 Document has been removed Logs Aug 03, 2014
MP10000 Document has been removed Logs Apr 16, 2013
MP10001 Document has been removed Logs Jan 01, 2014
MP10019 Daily Contractor Plans and Contact Information (899.37 KB) Logs Jul 01, 2014
MP10020 Daily TSF Inspector Reports (14.29 MB) Logs Jul 21, 2014
MP10021 Daily TSF Mine Operations Logs and Contact Information (686.61 KB) Logs Jul 21, 2014
MP10022 Document has been removed Logs Aug 03, 2014
MPMC00054 KP Drill Logs (8.29 MB) Logs Jan 01, 1989
MP10030 Logs for Tailings Checklist May to August 2014 (4.27 MB) Logs Apr 25, 2014
MP00052 Permit Conditions Response, Mount Polley Mine (533.76 KB) Miscellaneous Jan 25, 2011
MP00213 Table of all Mines Act permits and permit amendments (20.57 KB) Permits Aug 05, 2014

Pages