Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 351 - 375 of 847
View: 25 | 50 | 100
Document ID Title Type Publishedsort ascending
MPMC00138 2011 Environmental and Reclamation Report Appendix A - QA QC (444.03 KB) Appendix Mar 01, 2012
MPMC00150 2011 Environmental and Reclamation Report Appendix K- Disturbances Existing and Projected (105.06 KB) Appendix Mar 01, 2012
MPMC00139 2011 Environmental and Reclamation Report Appendix B - Surface Water Quality (4.54 MB) Appendix Mar 01, 2012
AMEC00139 TSF 2011 Geotechnical Site Investigation Draft Report (2) (1.57 MB) Report Feb 14, 2012
AMEC00131 TSF 2011 Geotechnical Site Investigation Draft Report (533.17 KB) Report Feb 14, 2012
AMEC00132 2012 Construction Monitoring Manual (449.75 KB) Report Feb 14, 2012
AMEC00143 TSF 2011 Geotechnical Site Investigation Draft Report (3) (1.62 MB) Report Feb 14, 2012
AMEC00136 2012 Construction Monitoring Manual (2) (468.39 KB) Report Feb 14, 2012
AMEC00148 TSF- 2012 Stage 8 Expansion - Stability Analyses (569.5 KB) Report Feb 14, 2012
AMEC00149 TSF- 2012 Stage 8 Expansion - Stability Analyses (2) (753.4 KB) Report Feb 14, 2012
AMEC00284 RE Slope Inclinometers Survey (131.58 KB) Outlook Email Jan 19, 2012
AMEC00282 RE Slope Inclinometer Survey (109.19 KB) Outlook Email Jan 17, 2012
MPMC00121 2012 Ortho (51.56 MB) Drawing Jan 01, 2012
MPMC00089 Document has been removed Inspection Report Jan 01, 2012
MPMC00095 Document has been removed Inspection Report Jan 01, 2012
MPMC00109 Mount Polley Water and Load Balance (2.36 MB) Report Dec 01, 2011
AMEC00130 FW Settling test using Glacial till (61.21 KB) Outlook Email Oct 26, 2011
AMEC00281 Monitoring Wells (88.22 KB) Outlook Email Oct 12, 2011
MPMC00066 Document has been removed Inspection Report Sep 01, 2011
AMEC00277 RE Daily Construction Report (88.23 KB) Outlook Email Aug 09, 2011
AMEC00279 Construction Testing (75.32 KB) Outlook Email Aug 09, 2011
AMEC00280 RE Construction Testing (112.54 KB) Outlook Email Aug 09, 2011
AMEC00128 Quality Assurance Summary No. 1 Stage 7 TSF Raise (259.76 KB) Report Aug 05, 2011
AMEC00129 Specifications for Drilling, Monitoring Well Installations and Related Services (1.41 MB) Report Aug 01, 2011
MPMC00065 Document has been removed Inspection Report Aug 01, 2011

Pages