Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 276 - 300 of 847
View: 25 | 50 | 100
Document ID Title Type Publishedsort ascending
MP00169 Report of Geotechnical Inspector Date of Inspection - September 24, 2012 (5.91 MB) Inspection Report Sep 24, 2012
MP00224 Mount Polley Mine - 2012 Tailings Construction [Additional Raise] (88 KB) Email Sep 19, 2012
MP00223 Mount Polley Mine - 2012 Tailings Construction [Additional Raise] (151.77 KB) Email Sep 19, 2012
AMEC00293 RE Borrow Pit Testpit Cross-sections (92.99 KB) Outlook Email Sep 11, 2012
AMEC00296 Perimeter Borrow Pit Floor Test Pit Investigation Conducted on Aug. 15 2012 (111.15 KB) Drawings Sep 11, 2012
AMEC00160 2012 Stage 8A TSF Construction Drawings and Stability Analyses for Embankment Raise to El. 965m (36.15 KB) Memo Sep 10, 2012
MP00042 2012 Stage 8A Tailings Storage Facility Construction Drawings and Stability Analyses for Embankment Raise El. 965m (7.15 MB) Report Sep 10, 2012
MPMC00040 2012 Stage 8A Tailings Storage Facility Construction Drawings and Stability Analyses for Embankment Raise El. 965m (7.15 MB) Report Sep 10, 2012
AMEC00158 2012 Stage 8A TSF Construction Drawings and Stability Analyses for Raise to El. 965m -Signed (29.71 KB) Memo Sep 10, 2012
AMEC00159 TSF 2012 Stage 8a (965m) Expansion Stability Analyses (676.14 KB) Report Sep 10, 2012
AMEC00257 TSF - 2012 Stage 8A TSF Construction Drawings and Stability Analysis for Embankment Raise (5.64 MB) Binder - Report Sep 10, 2012
AMEC00232 Document has been removed Folio Of Daily Reports Sep 01, 2012
MPMC00071 Document has been removed Inspection Report Sep 01, 2012
AMEC00156 2012 Stage 8A (965.0 m) TSF Stability Analysis and Construction Drawings (22.77 KB) Letter Sep 01, 2012
AMEC00295 Grain Size Distribution (131.53 KB) Report Aug 24, 2012
AMEC00294 Laboratory Testing Results (1.28 MB) Report Aug 21, 2012
AMEC00291 RE Daily Report (92.46 KB) Outlook Email Aug 20, 2012
AMEC00292 Grain Size Results (50.1 KB) Table Aug 09, 2012
AMEC00226 Document has been removed Folio Of Daily Reports Aug 01, 2012
MPMC00070 Document has been removed Inspection Report Aug 01, 2012
AMEC00290 Back to design at corner 4 (411.43 KB) Sketch Jul 27, 2012
AMEC00289 Back to design at corner 4 - Mt. Polley (74.95 KB) Outlook Email Jul 27, 2012
AMEC00227 Document has been removed Folio Of Daily Reports Jul 12, 2012
AMEC00287 Mount Polley TSF Density tests (80.21 KB) Outlook Email Jul 02, 2012
MPMC00069 Document has been removed Inspection Report Jul 01, 2012

Pages