Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 101 - 125 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
AMEC00101 Efficiency of Tailings Construction Operations (6) (195.19 KB) Report Jun 10, 2008
AMEC00102 Sediment/Polishing Retention Pond Downstream of the Perimeter Embankment (3.78 MB) Letter May 11, 2009
AMEC00103 TSF OMS (5.83 MB) Report Mar 30, 2010
AMEC00104 Report on Geotechnical Investigations and Design of Open Pits and Waste Dumps (925.27 KB) Report Jul 05, 1996
AMEC00105 TSF Report on 2009 Annual Inspection (18.21 MB) Report Jan 05, 2010
AMEC00106 Capacity of the Existing Mine Tailings Pipeline (402.91 KB) Letter Jul 24, 2008
AMEC00107 TSF Report on 2007 Annual Inspection (3.54 MB) Report Dec 19, 2007
AMEC00108 TSF Report on 2010 Annual Inspection (incomplete) (1.23 MB) Report Jan 25, 2011
AMEC00109 TSF Report on 2010 Annual Inspection (7.51 MB) Report Jan 25, 2011
AMEC00110 Stage 6 Design Report for the Tailings Storage Facility - Mount Polley Mine (14.28 MB) Report Jun 18, 2007
AMEC00111 TSF OMS (325.39 KB) Report Oct 06, 2006
AMEC00112 Design of the TSF to Ultimate Elevation (28.27 MB) Report Mar 14, 2005
AMEC00113 TSF Design Report Volume 1 (7.07 MB) Report May 26, 1995
AMEC00114 TSF Design Report Volume 2 (10.65 MB) Report May 26, 1995
AMEC00115 2011 Stage 7 Expansion Stability Analyses TSF Draft with Comments (258.83 KB) Report
AMEC00116 2011 Stage 7 Expansion Stability Analyses TSF (212.26 KB) Report
AMEC00117 TSF Report on Stage 6B Construction (11.85 MB) Report Jan 25, 2011
AMEC00118 2011 Construction Monitoring Manual (610.92 KB) Report Apr 15, 2011
AMEC00119 DRAFT 2011 Construction Monitoring Manual (700.09 KB) Report Apr 15, 2011
AMEC00120 DRAFT 2011 Construction Monitoring Manual (2) (699.88 KB) Report Apr 15, 2011
AMEC00121 2011 Stage 7 Expansion Stability Analyses TSF (2) (217.12 KB) Report
AMEC00122 2011 Stage 7 Expansion Stability Analyses TSF (3) (217.08 KB) Report
AMEC00123 2011 Construction Monitoring Manual (536.01 KB) Report Apr 19, 2011
AMEC00124 DRAFT 2011 Construction Monitoring Manual (3) (702.22 KB) Report Apr 15, 2011
AMEC00125 2011 Stage 7 Expansion Stability Analyses TSF with appendices (496.33 KB) Report

Pages