Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 276 - 300 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
AMEC00276 Laboratory Testing Results (220.29 KB) Table Jul 07, 2011
AMEC00277 RE Daily Construction Report (88.23 KB) Outlook Email Aug 09, 2011
AMEC00278 Zone A to Zone I Temperature Readings (56.25 KB) Table Jul 07, 2011
AMEC00279 Construction Testing (75.32 KB) Outlook Email Aug 09, 2011
AMEC00280 RE Construction Testing (112.54 KB) Outlook Email Aug 09, 2011
AMEC00281 Monitoring Wells (88.22 KB) Outlook Email Oct 12, 2011
AMEC00282 RE Slope Inclinometer Survey (109.19 KB) Outlook Email Jan 17, 2012
AMEC00283 Mt.Polley Instrumentation Installation Package part 2 (67.71 KB) Outlook Email Jul 10, 2011
AMEC00284 RE Slope Inclinometers Survey (131.58 KB) Outlook Email Jan 19, 2012
AMEC00285 RE Impoundment Stability (105.58 KB) Outlook Email Jun 05, 2012
AMEC00286 RE flyover topo (101.71 KB) Outlook Email Jun 20, 2012
AMEC00287 Mount Polley TSF Density tests (80.21 KB) Outlook Email Jul 02, 2012
AMEC00288 Construction Density Testing (297.66 KB) Table Jul 01, 2012
AMEC00289 Back to design at corner 4 - Mt. Polley (74.95 KB) Outlook Email Jul 27, 2012
AMEC00290 Back to design at corner 4 (411.43 KB) Sketch Jul 27, 2012
AMEC00291 RE Daily Report (92.46 KB) Outlook Email Aug 20, 2012
AMEC00292 Grain Size Results (50.1 KB) Table Aug 09, 2012
AMEC00293 RE Borrow Pit Testpit Cross-sections (92.99 KB) Outlook Email Sep 11, 2012
AMEC00294 Laboratory Testing Results (1.28 MB) Report Aug 21, 2012
AMEC00295 Grain Size Distribution (131.53 KB) Report Aug 24, 2012
AMEC00296 Perimeter Borrow Pit Floor Test Pit Investigation Conducted on Aug. 15 2012 (111.15 KB) Drawings Sep 11, 2012
AMEC00297 RE Hydrological Data (82.82 KB) Outlook Email Jan 02, 2013
AMEC00298 Environmental Setting (6.79 MB) Report
AMEC00299 RE Hydrological Data (82.67 KB) Outlook Email Jan 02, 2013
AMEC00300 RE Hydrological Data (82.06 KB) Outlook Email Jan 02, 2013

Pages