Background Information

The Panel considers the supporting information and substantiating documentation to be an integral part of its report that is necessary for a proper understanding of its findings.

There are multiple parties involved in various investigations of Mount Polley Tailings Storage Facility (TSF) failure. The Panel must ensure that the conduct of the inquiry does not in any way impede or conflict with any other ongoing investigation or proceeding related to this matter. Specifically, the Panel’s review must not in any way impede investigations conducted by Mines Inspectors, Conservations Officers or other regulatory agencies and any related proceedings. Further, all disclosures of the Panel must be compliant with the privacy protection provisions of the Freedom of Information and Protection of Privacy Act (FIPPA).

The B.C. Ministry of Energy and Mines and Ministry of Environment, Conservation Officer Services, have directed the Panel to withhold some of the documents, and redact portions of other documents, so that the Panel’s inquiry does not compromise any other investigations and to ensure it is in compliance with the privacy protection provisions of FIPPA (see Appendix A). The redaction of personal information was completed by Shared Services BC. As a result, these documents, which may have been cited in this report, are not available at this time. See Appendix B for more information on the provision of Supporting Information.

Note: Certain large files linked below may take up to several minutes to download. Certain files may also require specialized software for viewing.

Displaying 251 - 275 of 847
View: 25 | 50 | 100
Document IDsort descending Title Type Published
AMEC00251 Monthly Composite Final Tailing Size Distribution (71.2 KB) Binder- Pdf Of Spreadsheet
AMEC00252 Efficiency of Tailings Constructions Operations (3.22 MB) Binder- Report Dec 01, 2006
AMEC00253 TSF -Stage 7 2011 Construction Monitoring Manual (5.36 MB) Binder - Report Apr 20, 2011
AMEC00254 TSF 2011 Geotechnical Site Investigation -FINAL (4.57 MB) Binder - Report Mar 28, 2012
AMEC00255 TSF 2011 Construction As-Built Report and Annual Review (4.49 MB) Binder - Report Mar 30, 2012
AMEC00256 TSF - Stage 8 2012 Construction Monitoring Manual (1.67 MB) Binder- Report Mar 30, 2012
AMEC00257 TSF - 2012 Stage 8A TSF Construction Drawings and Stability Analysis for Embankment Raise (5.64 MB) Binder - Report Sep 10, 2012
AMEC00258 Index Vol 2 of 2 (38.93 KB) Binder- Index Vol 2 Of 2
AMEC00259 TSF Stage 8/8A 2012 As-Built Report (4.29 MB) Binder - Report Mar 27, 2013
AMEC00260 MPM Hydrogeology Assessment and Data Review (1.23 MB) Binder - Report Mar 26, 2013
AMEC00261 MPM TSF 2013 Construction Monitoring Manual (2.24 MB) Binder - Report Apr 11, 2013
AMEC00262 MPM TSF Stage 9 2013 As-Built and Annual Review Report (5.9 MB) Binder - Report Mar 12, 2014
AMEC00263 Appendices to Stage 9 2013 As-Built and Annual Review Report (1.87 MB) Binder - Appendices
AMEC00264 MPM TSF Instrumentation Review and Recommendations (692.93 KB) Binder - Memo Jun 14, 2011
AMEC00265 MPM TSF Stage 9 2013 Construction Monitoring Manual Clarification (Zone S Compaction Specifications) (37.81 KB) Binder- Memo Jun 06, 2013
AMEC00266 MPM TSF 2013 Annual Site Inspection Summary Memo (72.33 KB) Binder - Memo Aug 16, 2013
AMEC00267 MPM TSF Expansion (116.09 KB) Binder - Memo Jul 28, 2014
AMEC00268 MPM TSF Corner 5 Realignment to Crest El 970 m (124.89 KB) Binder - Memo Jul 30, 2014
AMEC00269 Mt Polley Tailings Facility Field Review (392.33 KB) Binder - Memo May 30, 2014
AMEC00270 RE Daily Construction Report (97.6 KB) Outlook Email Jul 12, 2011
AMEC00271 Construction Density Testing (29.63 KB) Table Jul 11, 2011
AMEC00272 RE Daily Construction Report (107.54 KB) Outlook Email Jul 12, 2011
AMEC00273 Construction Density Testing (72.99 KB) Table Jul 12, 2011
AMEC00274 Construction Daily Report (317.65 KB) Daily Report Jul 12, 2011
AMEC00275 RE Construction Daily Report (94.59 KB) Outlook Email Jul 15, 2011

Pages